Operating procedure
Display panel
(1) Close the door.
Please lock the door so it cannot be
opend accidentally during operation.
(2) Insert power plug.
(3)
Switch the power (breaker) on.
Display shows kiln temperature.
(4)
Push
「
Basic program
」
key.
(5)
Push trial operation program.
(6)
Push
「
Start
」
key.
ー
During firing
《
5 hours
》 ー
(7) Firing completes when END is
displayed.
(8)
Push
「
Stop
」
key.
(9) Turn the main switch off.
9
※
The indicator lights up.
If you do not operate any
keys for 10 seconds, the
display turns back to show
the kiln temperature.
Basic
Prog.
・
When you do your first firing or haven’t used for a long time, or in the
rainy season, trial operation (dry operation) is necessary due to moisture
inside furnace.
・
Please use the kiln when kiln temperature becomes normal after trial operation.
Please do bisque firing first and then do glaze firing.
Please check the following points before trial operation (dry operation).
□ Is ventilation enough?
□ There are no flammable objects near the kiln?
Please ventilate well since
odors occur from heating
elements and heat insulating
board for the first operation.
Smoke and odors become less
with future firings.
The indicator light is off.
2 Trial operation
《
Time required: About 5 hours
》
K i l n t e m p e r a t u r e d u r i n g
operation is high.
Also,do not touch the kiln
since it may cause electric
shock during trial operation as
earth wire is disconnected.
〔
In case of electric leak (Power breaker trips)
〕
・
Remove the earth wire and do dry operation
(Be sure to connect earth wire after dry operation)
(1)
(2)
(3)
WARNING
2
Trial Operation
Installation
2
Lock the door in the event
that children may open it
accidentally.
Be sure to switch the power
off before you open the
door.
Do not touch kiln due to
high temperature.
Be careful not to touch
or let objects come into
contact with the bottom of
the kiln, the bottom of the
door and cooling fan.
Ventilation
DANGER
DANGER
DANGER
DANGER
△
!
△
!
△
!
△
!
△
!
shows flashing.