![Shimadzu OMRON CJ Series Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/shimadzu/omron-cj-series/omron-cj-series_network-connection-manual_1256907035.webp)
7
.
Serial Communications Connection Procedure
32
7.3.5. Transferring the Project Data
Transfer the project data to the PLC.
1
Select
Programs
in the project
workspace of CX-programmer.
Select
Transfer
–
To PLC
from
the PLC Menu.
2
Select
Program(s)
,
Comments
and
Program index
. Click
OK
.
*You do not need to transfer I/O
table and Special Unit Setup
because they are already set in
7.3.3. Creating an I/O Table
and
7.3.4. Parameter Settings
.
*The
Comments
and
Program
index
Check Boxes may not be
displayed depending on the
PLC type. In that case, select
Program(s)
only and transfer
the project data.
3
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
Yes
.
Содержание OMRON CJ Series
Страница 82: ...2020 0120 0120 P732 E1 01...