7
.
Serial Communications Connection Procedure
27
Precautions for Correct Use
The PLC will be reset after creating and transferring an I/O table in steps 3 and 4.
Always confirm safety before creating and transferring an I/O table.
3
Select
Create
from the Options
Menu of the PLC IO Table
Window.
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
Yes
.
The dialog box on the right is
displayed. Confirm that there is
no problem, and click
Yes
.
4
The Transfer from PLC Dialog
Box is displayed.
Select
IO Table
and
SIO Unit
Parameters
. Click
Transfer
.
When the transfer is complete,
the Transfer Results Dialog Box
is displayed.
Check that the transfer is
succeeded by referring to the
message in the dialog box.
When an I/O table is created
successfully, the dialog box
displays as follows:
Transfer Success: 1 Unit
Transfer Unsuccessful: 0 Unit
Click
OK
.