![Shihlin electric SE2 Series Скачать руководство пользователя страница 131](http://html.mh-extra.com/html/shihlin-electric/se2-series/se2-series_manual_1256846131.webp)
125
5. Inspection and Maintenance
Inspection and Maintenance
Positive
voltage
Negative
voltage
Normal
result
Positive
voltage
Negative
voltage
Normal
result
Terminal
mark
P
S/L2
Not
conducting
Terminal
mark
P
V/T2
Not
conducting
P
T/L3
Not
conducting
P
W/T3
Not
conducting
R/L1
N
Not
conducting
U/T1
N
Not
conducting
S/L2
N
Not
conducting
V/T2
N
Not
conducting
T/L3
N
Not
conducting
W/T3
N
Not
conducting
N
R/L1
Conducting
N
U/T1
Conducting
N
S/L2
Conducting
N
V/T2
Conducting
N
T/L3
Conducting
N
W/T3
Conducting