background image

Page 2

ATTENTION:

This shelter product is manufactured with quality materials. It is designed to fit our custom fabric cover included.

Our shelters offer storage and protection from damage caused by sun, light rain, tree sap, animal - bird excrement and light snow.

Please anchor this structure properly. See manual for more anchoring details. Proper anchoring, keeping cover tight and free of

snow and debris is the responsibility of the consumer. Please read and understand the installation detail, warnings and cautions

prior to beginning installation. If you have any questions contact your local dealer.

DANGER:

Prior to installation, choose the location of your shelter carefully.

DANGER:

Keep away from electrical wires.

Check for overhead utility lines, tree branches or other structures. Check for underground pipes or
wires before you dig. DO NOT install near roof lines or other structures that could shed snow,
ice or excessive run off onto your shelter. DO NOT hang objects from the roof or support cables.

WARNING:

Risk of fire. DO NOT smoke or use open flame devices (including grills, fire pits, deep fryers, smokers or

lanterns) in or around the shelter. DO NOT store flammable liquids (gasoline, kerosene, propane, etc.) in

or around your shelter. Do not expose top or sides of the shelter to open fire or other flame source.

CAUTION:

Use

CAUTION

when erecting the frame. Use safety goggles during installation. Secure and bolt together

overhead poles during assembly. Beware of pole ends.

PROPER ANCHORING AND INSTALLATION OF FRAME:

PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER.

We are not responsible for damage to the unit or the contents from acts of nature. Any shelter that is not anchored

securely has the potential to fly away causing damage, and is not covered under the warranty. Periodically check the anchors to

ensure stability of shelter. We cannot be responsible for any shelter that blows away.

NOTE:

Your shelter’s cover can be quickly removed and stored prior to severe weather conditions

. If strong winds or severe

weather is forecast in your area, we recommend removal of cover.

CARE AND CLEANING:

A tight cover ensures longer life and performance. Always maintain a tight cover. Loose fabric can accelerate

deterioration of cover fabric. Immediately remove any accumulated snow or ice from the roof structure with a

broom, mop or other soft-sided instrument. Use extreme caution when removing snow from cover- always

remove from outside the structure. DO NOT use hard-edged tools or instruments like rakes or shovels to

remove snow. This could result in punctures to the cover. DO NOT use bleach or harsh abrasive products to

clean the fabric cover. Cover is easily cleaned with mild soap and water.

WARRANTY:

This shelter carries a full limited warranty against defects in workmanship. We warrant to the Original Purchaser that if

properly used and installed, the product and all associated parts, are free from manufacturer’s defects for a period of:

1 YEAR FOR COVER FABRIC, END PANELS AND FRAMEWORK

Содержание 132013R

Страница 1: ...ctions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before yo...

Страница 2: ...bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER We are not responsible...

Страница 3: ...Purlins 15 5 Tension Pipe 2 6 Bracing Pipe 4 7 The Front Wall Rail 1 8 Hangar Rod 1 9 Pulling Rod 1 10 Upright for Back Wall 1 11 Upright for Back Wall 1 12 Middle Rails for Back Wall 2 13 Tension Pip...

Страница 4: ...back wall 52 6 21 Bolt M10x30mm for Connection Plate 4 2 22 Bolt M10x60mm for Connection Plate 4 2 23 Bolt M8x50mm for Bracing Pipe 8 2 24 Pipe Clip 60 8 25 Tension Strap 32 1000mm 8 2 26 Plastic Plug...

Страница 5: ...Page 5 INSTALLATION PROCESS Base Plate Installation Please refer to the diagram below to mark the position of base plates Frame Installation Step 1 Arch No 1 Front Wall...

Страница 6: ...Page 6 Step 2 Arch No 2 No 3...

Страница 7: ...Page 7 Step 3 Arch No 5 Back Wall...

Страница 8: ...Page 8 Step 4 Purlins and Sidewall Bracing Tubes Step 5 Squaring Up The Frame and Install Stake Pegs...

Страница 9: ...Page 9 Cover Installation Front Cover and Front Door Back Cover...

Страница 10: ...Page 10 Roof Cover Now your assembly is completed...

Отзывы: