background image

Page 5

INSTALLATION PROCESS

Base Plate Installation

Please refer to the diagram below to mark the position of base plates

Frame Installation

Step 1: Arch No.1 (Front Wall)

Содержание 132013R

Страница 1: ...ctions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before yo...

Страница 2: ...bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER We are not responsible...

Страница 3: ...Purlins 15 5 Tension Pipe 2 6 Bracing Pipe 4 7 The Front Wall Rail 1 8 Hangar Rod 1 9 Pulling Rod 1 10 Upright for Back Wall 1 11 Upright for Back Wall 1 12 Middle Rails for Back Wall 2 13 Tension Pip...

Страница 4: ...back wall 52 6 21 Bolt M10x30mm for Connection Plate 4 2 22 Bolt M10x60mm for Connection Plate 4 2 23 Bolt M8x50mm for Bracing Pipe 8 2 24 Pipe Clip 60 8 25 Tension Strap 32 1000mm 8 2 26 Plastic Plug...

Страница 5: ...Page 5 INSTALLATION PROCESS Base Plate Installation Please refer to the diagram below to mark the position of base plates Frame Installation Step 1 Arch No 1 Front Wall...

Страница 6: ...Page 6 Step 2 Arch No 2 No 3...

Страница 7: ...Page 7 Step 3 Arch No 5 Back Wall...

Страница 8: ...Page 8 Step 4 Purlins and Sidewall Bracing Tubes Step 5 Squaring Up The Frame and Install Stake Pegs...

Страница 9: ...Page 9 Cover Installation Front Cover and Front Door Back Cover...

Страница 10: ...Page 10 Roof Cover Now your assembly is completed...

Отзывы: