![SHELTER 132013R Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/shelter/132013r/132013r_assembly-instructions-manual_1255412004.webp)
Page 4
19
Carriage Bolt M10x80mm for
purlins
)
21+3
20
Bolt M8x70mm for arches
connection and the upright
connection of back wall
52+6
21
Bolt M10x30mm for Connection
Plate
4+2
22
Bolt M10x60mm for Connection
Plate
4+2
23
Bolt M8x50mm for Bracing Pipe
8+2
24
Pipe Clip 60#
8
25
Tension Strap 32*1000mm
8+2
26
Plastic Plug Φ32
4
27
Stake Anchors 14*450
22
28
Nylon Ropes 4# 100m
(
20m/pcs *
5pcs
)
1
29
Roof Cover
1
30
Front Cover
1
31
Back Cover
1
Содержание 132013R
Страница 6: ...Page 6 Step 2 Arch No 2 No 3...
Страница 7: ...Page 7 Step 3 Arch No 5 Back Wall...
Страница 8: ...Page 8 Step 4 Purlins and Sidewall Bracing Tubes Step 5 Squaring Up The Frame and Install Stake Pegs...
Страница 9: ...Page 9 Cover Installation Front Cover and Front Door Back Cover...
Страница 10: ...Page 10 Roof Cover Now your assembly is completed...