![Shel lab SCO10A Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/shel-lab/sco10a/sco10a_installation-and-operation-manual_1255275018.webp)
18 |
P a g e
INSTALLATION
L
IFTING AND
H
ANDLING
The unit is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow these
guidelines when lifting the unit.
•
Lift the unit only from its bottom surface.
•
Doors, handles, and knobs are not adequate for lifting or stabilization.
•
Restrain the unit completely while lifting or transporting so it cannot tip.
•
Remove all moving parts, such as shelves and trays, and lock doors in the closed position
during transfers to prevent shifting and damage.
L
EVELING
Install the leveling feet in the 4 corner holes on the bottom of the unit. The unit must be level and
stable for safe operation.
Note:
To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.
Содержание SCO10A
Страница 1: ...AIR JACKETED CO2 INCUBATOR 110 120 Volts Installation Operation Manual SCO10A SCO5A...
Страница 6: ...6 P a g e TABLE OF CONTENTS...
Страница 24: ...24 P a g e INSTALLATION...
Страница 26: ...26 P a g e SYMBOLS...
Страница 59: ...59 P a g e PARTS...