8-2
MAINTENANCE SCHEDULE
We suggest you do the maintenance on schedule.
Before beginning a day’s work
1. Please check the hydraulic oil level. If oil level volume is below 1/2, please add oil as
necessary.(Filling up to 2/3 level is better for system operation.)
2. Please check the cutting fluid level, adding fluid as necessary. If the fluid appears contaminated
or deteriorated, drain and replace it.
3. Please check the saw blade to ensure that it is properly positioned on both the drive and idle
wheels.
4. Please make sure that the saw blade is properly clamped by the left and right inserts.
5. Please check the wire brush for proper contact with the saw blade. Replace the wire brush if it is
worn out.
After ending a day
’
s work
Please remove saw chips and clean the machine with discharging the cutting fluid when work has
been completed.
Do not discharge cutting fluid while the saw blade is operating because it will cause severe
injury on operator
’
s hand.
Be sure the saw blade is fully stop, it will be performed after working inspection.
Every 2 weeks
Please apply grease to the following points:
1. Idle wheel
2. Drive wheel
3. Blade tension device
Recommended Grease:
Shell Alvania EP Grease 2
Mobil Mobilplex 48
First 600hrs for new machine,then every 1200hrs
for routine change
Replace the transmission oil after operating for
first 600hrs for new machine,then every 1200hrs
Recommended gear oil
Shell Omala oil HD220
Mobil gear 630
Recommended hydraulic oil
ShellTellus 32
Mobil DTE Oil Light Hydraulic 24
Содержание SW-180NC
Страница 1: ...SW 180NC Instruction Manual Version 1 20180619 ...
Страница 2: ......
Страница 8: ......
Страница 13: ...1 5 Illustration Emergency Stop Emergency Stop ...
Страница 15: ...1 7 Illustration Safety Labels SW 180NC SafetyLabels ...
Страница 20: ...2 4 FLOOR PLAN Machine top view ...
Страница 21: ...2 5 Machine front view Machine side view ...
Страница 22: ......
Страница 66: ......
Страница 67: ...6 1 Section 5 ELECTRICAL SYSTEM ELECTRICAL DIAGRAMS ...
Страница 68: ......
Страница 69: ...SW 180NC CONTROL PANEL LAYOUT ...
Страница 70: ...SW 180NC CIRCUIT BOARD LAYOUT ...
Страница 71: ...SW 180NC POWER SUPPLY LAYOUT ...
Страница 72: ...SW 180NC PLC INPUT OUTPUT LAYOUT ...
Страница 73: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC DIAGRAMS ...
Страница 74: ...SW 180NC Hydraulic Circuit 2015 03 23 ...
Страница 75: ...7 1 Section 7 BANDSAW CUTTING A PRACTICAL GUIDE INTRODUCTION SAW BLADE SELECTION VISE LOADING BladeBreak In ...
Страница 96: ......
Страница 97: ...TOTAL ASSEMBLY 10_2 SW 180NC ...
Страница 98: ...3 9 10 16 13 15 12 8 7 11 4 5 1 2 17 6 18 20 21 19 14 Base assembly 10_3 SW 180NC ...
Страница 104: ...13 14 18 19 7 10 17 9 3 11 2 1 4 8 15 12 5 6 16 C470H 20000固定床面組 10_9 SW 180NC ...
Страница 106: ...22 6 1 27 8 16 26 10 30 24 23 19 25 28 5 18 2 31 7 9 4 17 29 13 11 15 21 14 20 12 3 32 C470H 20000送料床面組 10_11 SW 180NC ...
Страница 114: ...4 16 1 15 8 10 7 6 3 5 13 12 11 2 14 17 9 C470H 31000 鋸臂組 Saw arm assembly 10_19 SW 180NC ...
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......