48
E
• When installing, removing or moving the monitor, ensure that this is carried out by at least 2 people.
• Be sure to use a wall-mount bracket designed or designated for mounting the monitor.
• This monitor is designed to be installed on a concrete wall or pillar. Reinforced work might be necessary for some materials
such as plaster / thin plastic board / wood before starting installation.
• This monitor and bracket must be installed on a wall which can endure at least 4 times or more the weight of the monitor.
Install by the most suitable method for the material and the structure.
• To attach a VESA-compliant mounting bracket, use M6 screws that are 5/16 inch (8 mm) to 3/8 inch (10 mm) longer than the
thickness of the mounting bracket.
• Do not use an impact driver.
• When moving the monitor, hold the parts marked by
below. Do not hold the LCD panel. This may cause product
damage, failure, or injury.
• After mounting, please carefully ensure the monitor is secure, and not able to come loose from the wall or mount.
• Do not use any screw holes other than VESA holes for installation.
Mounting Precautions
(For SHARP dealers and service engineers)
Содержание PN-Y425
Страница 1: ...PN Y555 PN Y475 PN Y425 LCD MONITOR OPERATION MANUAL ...
Страница 49: ...PN Y555 Y475 Y425 Me EN14G 2 ...