ENGLISH
E-9
INSTALLATION AGAINST
WOODEN PANELLING
1
Insert the Wood screw, and Screw
the Clasp together into the Panel.
NOTE
If the surface is plasterboard,
please install the system
against a stable pillar to which
the plasterboard is attached.
1
Drill a hole on the wall.
Use a drill suited to the material of the wall,
and make a hole 5 mm in diameter and at
least 35 mm deep.
INSTRUCTION
Please ensure the wall, pillar, or sash bar
is at least 35 mm thick before installation.
2
Insert the Wood screw through
the Clasp of the Chain, and into
the mouth of the Fisher plug to a
depth that it is secure.
3
Insert the Fisher plug firmly into
the wall.
4
Screw in the Screw.
1
Clean the surface to be attached to.
Ensure that the surface is not greasy.
2
Attach the Metal fitting to the wall
using the double-side tapes on
the back.
(2 pieces)
3
Insert the small screw enclosed
with the Metal fitting through the
Clasp of the Chain, and fasten it
up to the Metal
fitting.
(2 pieces)
NOTES
• Please use a flat wall surface for such instal-
lation.
• Please carefully remove any oil, moisture, and
dust from the wall surface before installation.
• Please attach the system tightly to the wall
by applying pressure.
• It takes a while for the adhesive on the tape
to set, so please do not exert undue loads on
the tape for a couple of hours.
Clasp
Small screw
Main unit
INSTALLATION AGAINST AN
ALC, CONCRETE, BRICK,
OR MORTAR WALL
Wood screw
Clasp
Fisher plug
Adjust the foot to ensure
stability.
Peel off the
cover sheets.
IN THE EVENT THAT THE
SCREWS CANNOT BE APPLIED
DIRECTLY TO A RETAINING WALL
20mm
SETTING UP THE UNIT IN AN
APPROPRIATE POSITION
Adjust the foot to ensure stability.
NOTE
• Please ensure the Chain has enough slack
to prevent it being fully extended or pulled-
out when the unit is set up.
Front Panel
ø5mm
35mm
Содержание FU-800-J
Страница 1: ...ENGLISH FU 800 J AIR PURIFIER OPERATION MANUAL Floor type R ...
Страница 2: ......
Страница 27: ...ENGLISH ...
Страница 28: ...SHARP CORPORATION OSAKA JAPAN TINS A103KKRZ 03LK 1 ...