Rev. 1
118 /
[How to Initialize the Network Information]
(1)
Turn OFF the printer.
(2)
If the network cable is connected to the printer, disconnect the cable from the printer-side.
(3)
Press the black push switch ([Test] Button) on the NIC Card, and turn on the print.
Continue to press the black push SW until the following message appears on the top row
of the operation panel “One Moment” or the following message appears on the bottom
row “Initializing network”.
There is no longer any need to press the black push SW once the above is displayed.
(4)
Initialization is completed if “Ready to Print” appears on the operation panel.
For 1200dpi, NIC Card
[Procedure to Check that Network Information Has been Initialized]
(1)
Printer the “Printer Information” and “Setting Details”.
(2)
Check the following 2 points in the “Network” area of the first sheet of the results printed
for the setting details.
Slot: 100/10 Base
MAC Address
Short Printer Nam
IF the number value is the same (3 bytes), the network information has been success-
fully initialized.
Note
Содержание AR-C360P
Страница 2: ...Ver Date No Revision Page Changes In Charge Document Revision History ...
Страница 5: ...Rev 1 5 Do not go near an ejection area while the power is on and in printing You may get injured ...
Страница 9: ...Rev 1 9 ...
Страница 13: ...Rev 1 13 Finisher Unit AR C36TF 2 3 Hole Punch Unit AR C36HP No Image ...
Страница 16: ...Rev 1 16 ...
Страница 19: ...Rev 1 19 ...
Страница 40: ...Rev 1 40 ...
Страница 48: ...Rev 1 48 ...
Страница 51: ...Rev 1 51 4 2 Parts Layout Printer Unit 120V ...
Страница 52: ...Rev 1 52 Base Assy 1 2 A A ...
Страница 53: ...Rev 15 4 Base Assy 2 2 ...
Страница 54: ...Rev 1 55 Side R Assy ...
Страница 55: ...Rev 1 56 Side F Assy ...
Страница 56: ...Rev 1 56 Cover Assy OP Panel ...
Страница 57: ...Rev 1 57 FDR Unit Regist A A B B ...
Страница 58: ...Rev 1 58 FDR Unit MPT ...
Страница 59: ...Rev 1 59 Sensor Regist Assy ...
Страница 60: ...Rev 1 60 Eject Assy 2 ...
Страница 61: ...Rev 1 61 Plate Top Assy A A A A ...
Страница 62: ...Rev 1 62 Job Offset Assy ...
Страница 63: ...Rev 1 63 Basket Assy ...
Страница 64: ...Rev 1 64 Plate Shield Box Assy ...
Страница 65: ...Rev 1 65 Unit Duplex 1 2 8 ...
Страница 66: ...Rev 1 66 Unit Duplex 2 2 ...
Страница 87: ...Rev 1 87 Lever 1 4 3 20 Unit Duplex 1 Pull out Unit Duplex 1 while pressing the lever ...
Страница 89: ...2EV 89 ...
Страница 109: ...Rev 1 109 ...
Страница 161: ...Rev 1 161 Ground Charge roller Development roller Toner supply roller Development braid Figure 7 3 ...
Страница 169: ...Rev 1 169 8 2 Diagram of Part Layout of Various PCB ...
Страница 179: ...10 ERROR MESSAGE LIST Details undecided ...