www.shakmat.com
•
17/19
11. Finish
You’re almost done! The last thing
to do is to place the tactical plane
on the top PCB. Pay attention to
the orientation. The Shakmat logo
must be on the left side as shown
here.
Place all the push button caps.
Tighten the knurled nuts on the
jack sockets. Push the four knobs
onto their metal potentiometer.
Button caps (x8)
P1
Jack nuts (x6)
P1
Knobs (x4)
LP
Содержание Harlequin's Context
Страница 1: ...Shakmat Harlequin sContext BuildingGuide 12HP Eurorack Module Built designed in E U www shakmat com...
Страница 5: ...www shakmat com 04 19 3 PCB details Top PCB Front back Bottom PCB Front back C1 C2 C3 12V...
Страница 6: ...www shakmat com 05 19 Tactical Plan Front back...
Страница 21: ...www shakmat com...