15
be swapped with each other. If a connection cable, other than the one
which is supplied, is used for the lift, it is essential to use an H07RNF
cast rubber cable.
Check supply line for damage and replace immediately if necessary.
The lift is also available for 240 V mains power. Special circuit diagrams
must be observed here. Cables with large cross section are required.
4. Operation
The respective applicable accident prevention regulations must be
complied with.
• The pit lift is only permitted to be operated by trained personnel.
• Only put the pit lift in motion if there is no danger to persons.
• The movement range of the pit lift must be kept clear and no per
-
sons are permitted to be in the movement range.
• The maximum permitted load capacity of the pit lift must not be
exceeded.
• Climbing on the pit lift, riding on it and climbing on the load are
forbidden.
• Only load lift centrally, lift vehicle and check the safe vehicle support;
do not lift to the required height until then.
• Ensure that load is centered! Hold non-centered loads with cross
members (2-point support).
• The load bearing device must be centred on the load. Watch out for
the shift in centre of gravity during lifting.
• Make the lifting and lowering movements evenly. Monitor the load
during the movement.
• The raised load must be supported with support bridges or support
blocks.
• Engines must be secured reliably against slipping, sliding and tilting
Содержание FKE
Страница 1: ...Operating Manual and Test Log Pit lift HKE FKE Lifting capacity 10 t 14 t 20 t SOMMERER PIT LIFT...
Страница 22: ...22 8 Electrical and Hydraulic Diagram 8 1 Electrical Diagram HKE FKE400 Volt Standard...
Страница 23: ...23 8 2 Electrical diagram HKE FKE 240 Volt only on special request 8 3 Lift control...
Страница 24: ...24 9 Hydraulic diagram HKE FKE...
Страница 27: ......