7
1.4.
Obligation of the site operator
The site operator is obliged to only allow persons to work on the system
who
• are familiar with the basic regulations for occupational health and
safety and accident prevention and who have been instructed about
handling the system.
• have read and understood the safety chapter and warnings and
have confirmed this with their signature.
1.5.
Hazards handling the pit lift
The SOMMERER pit lifts have been designed and constructed accor
-
ding to the state of the art and the recognised safety regulations. Ne
-
vertheless, unintended use may endanger life and limb of the operator
or damage property. The pit lift is only permitted to be used:
• for the intended use
• in safe, faultless condition
► Faults which can adversely affect safety must be rectified immediately.
• Only put the pit lift in motion if there are no persons in the danger
area.
• The movement range of the pit lift must be kept clear.
• No persons are permitted to be present in the movement range of
the pit lift.
• The maximum permitted load capacity of the pit lift must not be
exceeded.
• Climbing on the pit lift, riding on it and climbing on the load are
forbidden!
• Only load lift centrally, lift vehicle and check the safe vehicle support;
do not lift to the required height until then
• Secure the vehicle against rolling away.
Содержание FKE
Страница 1: ...Operating Manual and Test Log Pit lift HKE FKE Lifting capacity 10 t 14 t 20 t SOMMERER PIT LIFT...
Страница 22: ...22 8 Electrical and Hydraulic Diagram 8 1 Electrical Diagram HKE FKE400 Volt Standard...
Страница 23: ...23 8 2 Electrical diagram HKE FKE 240 Volt only on special request 8 3 Lift control...
Страница 24: ...24 9 Hydraulic diagram HKE FKE...
Страница 27: ......