Page 6 of the General Building Inspectorate Approval No. Z-65.23-409 dated 5 April 2005
-
if residual pressure monitoring of the pressure cylinder with alarm
function is installed for operation with a permanently connected
pressure cylinder (stationary a pressure cylinder).
Refilling according to Annex B of DIN EN 13160-1 with air or inert gas as leak
detection medium (monitoring medium) is considered not to be safeguarded if
there is no residual pressure monitoring of the pressure cylinder with alarm
function for operation with the permanently connected pressure cylinder
(stationary pressure cylinder).
4.
Stipulations for the execution
4.1
(1) The leak detector must be installed according to section 4 of the Technical
Description and started up according to section 5 of the Technical Description.
Installation, servicing, repairs and cleaning of the leak detector must only be
contracted to such companies which are specialist companies for these
activities in accordance with § 19 I Water Resouces Act (WHG).
(2) The activities as per (1) do not have to be carried out by specialist
companies if they are featured under the exceptions for mandatory specialist
companies according to the national regulations or the manufacturer of the
approval item carries out these activities with his own specially qualified staff.
This does not affect the occupational safety requirements.
4.2
The leak detectors must be installed outside potentially explosive areas in a
dry room, or in a protective box when installed in the open air.
5
Stipulations for use, servicing, maintenance and recurrent tests
The leak detection systems with leak detectors must be operated and
maintained according to section 6 of the Technical Description. The
manufacturer must include the Technical Description with the delivery.
/round stamp/
German Institute for
Building Technology
/signature/
Certified
Dr. Ing. Kanning
46 von 49
Содержание DL 100
Страница 19: ...I I II II III III IV IV 21 21 21 21 20 20 20 20 27 11 2002 P 060 000 Druckleitung Messleitung 19 von 49 ...
Страница 20: ...Ex Ex Ex 17 102 72 73 43 13 27 11 2002 M1 060 000 76 30 21 20 70 20 von 49 ...
Страница 21: ...Ex Ex Ex 73 73 73 230 V 50 Hz 21 02 43 20 13 72 27 11 2002 M2 060 000 71 69 01 09 21 von 49 ...
Страница 22: ...27 11 2002 M3 065 000 45 71 29 69 01 09 103 104 14 Ex Ex Ex 73 73 73 230 V 50 Hz 21 02 43 20 13 22 von 49 ...
Страница 24: ...27 11 2002 SL 853 600 2 6 4 5 3 11 12 1 AC DC 105 106 102 71 01 69 24 1 59 09 76 17 60 Rp 24 von 49 ...
Страница 26: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90 26 von 49 ...
Страница 34: ...28 06 2005 Drilling Dimension 200 300 260 220 T 140 8 34 von 49 ...