![SGB DL 100 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/sgb/dl-100/dl-100_manual_1251031014.webp)
OVERPRESSURE – LEAK DETECTOR DL ..
(1) Once a year to ensure functional and operational safety.
(2) Scope of inspection as per chapter 6.4
(3) Also check compliance with the conditions in chapter 4.5 and 6.2.
6.3 Intended
use
•
Groups of interstitial space
only for underground
interstitial spaces.
•
Double-walled tanks, sumps or containments whose walls on the stored product side are
resistant to permeation from particles which can generate potentially explosive vapours.
EXCEPTION:
Inner walls not resistant to permeation when using an inert leak detection medium.
•
The alarm pressure must be min. 30 mbar higher than any pressure occurring in the
interstitial space (from inside and/or outside).
•
Grounding (where applicable) according to valid regulations
•
Leak detection system is impermeable, according to chapter 6.4.6 of this documentation.
•
Mount the leak detector outside potentially explosive area.
•
Lead-throughs for the pneumatic hoses are sealed gas tight.
•
Leak detector (electric) is connected so that it cannot be switched off.
6.4 Function
test
Check functional and operational safety
•
every time after start up
•
on the basis of chapter 6.2 in the intervals stated there
•
every time after troubleshooting
6.4.1 Test
scope
(1) Poss. check the scope of work with the person responsible on site.
(2) Comply with the safety regulations for handling the specific stored product.
(3) (DL .. ONLY) Regeneration/replacement of the filter filling.
(4) Check the free passage of air (gas) in the interstitial space (chapter 6.4.2).
(5) Check the switching values with the test unit (chapter 6.4.3),
alternatively: check the switching values without test unit (chapter 6.4.4)
(6) Check the overpressure valve (chapter 6.4.5).
(7) Tightness test (chapter 6.4.6).
(8) Restore operating condition (chapter 6.4.7).
(9) Test report confirming functional and operational safety to be compiled by the qualified
person.
10
e.g. EN 1127
11
For Germany; otherwise comply with the national regulations (e.g. VAwS)
26/01/2006
11
14 von 49
Содержание DL 100
Страница 19: ...I I II II III III IV IV 21 21 21 21 20 20 20 20 27 11 2002 P 060 000 Druckleitung Messleitung 19 von 49 ...
Страница 20: ...Ex Ex Ex 17 102 72 73 43 13 27 11 2002 M1 060 000 76 30 21 20 70 20 von 49 ...
Страница 21: ...Ex Ex Ex 73 73 73 230 V 50 Hz 21 02 43 20 13 72 27 11 2002 M2 060 000 71 69 01 09 21 von 49 ...
Страница 22: ...27 11 2002 M3 065 000 45 71 29 69 01 09 103 104 14 Ex Ex Ex 73 73 73 230 V 50 Hz 21 02 43 20 13 22 von 49 ...
Страница 24: ...27 11 2002 SL 853 600 2 6 4 5 3 11 12 1 AC DC 105 106 102 71 01 69 24 1 59 09 76 17 60 Rp 24 von 49 ...
Страница 26: ...22 84 85 85 22 52 98 98 0 Kl 1 0 17 12 2002 P 115 392 21 21 20 20 90 90 26 von 49 ...
Страница 34: ...28 06 2005 Drilling Dimension 200 300 260 220 T 140 8 34 von 49 ...