SFA SANITOP Скачать руководство пользователя страница 8

6

 

ADVICE

PIPE SUPPORTS

!LLSANITARYPIPEWORKMUSTBE

 

SUPPORTEDINACCORDANCEWITHTHEPIPE

MANUFACTURERSRECOMMENDATIONS

!VOIDDIPPINGORTRAPPINGWHICHMAY

CAUSETHEBUILDUPOFRESIDUALhSOLIDSv

ANDSUBSEQUENTBLOCKAGE

BENDS

7HEREPOSSIBLELONGSWEEPINGBENDS

SHOULDBEUSED$ONOTUSESHORT

ELBOWS)FSWEEPINGªELBOWSARENOT

AVAILABLEUSETWOªELBOWSTOMAKE

AªTURN

VERTICAL INSTALLATION FIRST

)FVERTICALLIFTISREQUIREDTHISMUST

 

PRECEDETHEHORIZONTALPIPERUN

DIRECTLY VERTICAL

!LLVERTICALLIFTSSHOULDRISEASDIRECTLY

ABOVETHEUNITASPOSSIBLEALLOWING

ONLYFORTHENEEDTOCLEARTHETOILET

TANK!NYINITIALHORIZONTALPIPERUN

 

FROMTHEUNITPRIORTOAVERTICALLIFT

SHOULDNOTEXCEEDINCHES

EASY ACCESS

4HEUNITSHOULDBEACCESSIBLEAND

REMOVABLEINTHEEVENTOFMAINTENANCE

BEINGREQUIRED$URINGTHEINSTALLATION

 

AFULLPORTBALLVALVESHOULDBEINSTALLED

ATTHEBASEOFANYVERTICALDISCHARGE

PIPEWORKFROMTHEUNITTOALLOWEASY

SERVICEOFTHEUNIT

NO DIRECT FALL

7HERETHEPOINTOFDISCHARGEINTOTHE

SOILSTACKISSIGNIFICANTLYLOWERTHANTHE

BASEOFTHEUNITAVACUUMRELIEFVALVE

MAYNEEDTOBEFITTEDATTHEHIGHEST

POINTINTHEPIPERUNINORDERTOAVOID

SIPHONAGEOFTHEWATERSEAL

THREE FEET MINIMUM

4HEMACERATINGUNITMUSTBEINSTALLED

ATLEASTFEETFROMTHESOILSTACK4HIS

WILLALLOWTHEMACERATORTOOPERATEFOR

ANADEQUATEPERIODOFTIMETOENSURE

 

EFFICIENTWASTEREDUCTION

SOIL STACK CONNECTION

!LLDISCHARGEPIPEWORKMUSTBE

CONNECTEDTOTHESOILSTACKBYAN

 

APPROPRIATEANDAPPROVEDCONNECTION

 

!hTEEvORvYvFITTINGASSHOWNIS

 

PREFERABLE

NO DIAGONAL “UPHILL” PIPE 
RUNS

!LLDISCHARGEPIPEWORKFROMTHE

UNITSHOULDRUNEITHERDIRECTLYVERTICAL

UPWARDSFROMITORINAHORIZONTALPLANE

WITHASMALLGRAVITYFLOW TOTHEPOINTOF

DISCHARGE0IPEWORKSHOULDNOTBE

 

INSTALLEDWITHDIAGONALUPWARDSLOPE

FROMTHEUNITTOTHEPOINTOFDISCHARGE

PIPE WORK

!LLPIPEWORKSHOULDBEEITHERCOPPER

06#OR#06#$ONOTUSEFLEXIBLE

PIPES (ANGERSSHOULDNOTBELESS

THANTHREEFEETAPARTTOPREVENTPIPE

RATTLING

DISCHARGE

.EVERDISCHARGEDIRECTLYINTOANOPEN

DRAINFIXTUREMANHOLEORRAINWATER

DRAINPIPE)TISILLEGALFORITCONSTITUTESA

HEALTHHAZARD$IRECTCONNECTIONSINTO

SANITARYWASTESYSTEMSONLYSHALLBE

ACCEPTABLE

FREEZING

%NSUREALLPIPEWORKSUSCEPTIBLETO

 

FREEZINGISADEQUATELYINSULATEDOR

 

HEATED)NUNHEATEDBUILDINGSTHE

 

TOILETPIPINGANDMACERATINGUNITMUST

BEPROPERLYWINTERIZEDWITHh26OR

 

PLUMBERSvANTIFREEZEORDRAINED

 

COMPLETELY

ELECTRICITY

"EFOREATTEMPTINGANYMAINTENANCEOR

SERVICINGTHEUNITMUSTBEDISCONNEC

TEDFROMTHEPOWERSOURCE4HEMACE

RATINGSYSTEMMUSTBECONNECTEDTOA

'ROUND&AULT#IRCUIT)NTERRUPTER'&#)

Содержание SANITOP

Страница 1: ...ould be installed by a licensed plumber Le produit doit tre install dans le respect des r glements sanitaires locaux Le produit doit tre install par un plombier qualifi CDN TOP IMPORTANT DO NOT RETURN...

Страница 2: ...3 4 28 PVC 1 32 PVC 3 4 22 CPVC 1 2 3 A x 1 B x 6 32 x 55 C x 1 90 x 110 G x 1 25 x 40 B F x 1 20 X 32 E x 2 1 1 2 1 1 2 B F G I x 1 H x 1 J x 1 D x 2 1 1 2 4 G 4 0LEASE REFER TO SECTION ERCI DE VOUS...

Страница 3: ...ITOP SANITOP 8 SANITOP Type ST SFA SANIFLO 120 V 60 Hz 5 0A 3 10 HP IP44 7 2 1 7a 7a C PERFORMANCE VERTICAL DISTANCE DISTANCE VERTICALE FEET PIEDS 12 9 6 3 0 40 50 60 70 80 90 14 17 19 20 L MIN 53 GAL...

Страница 4: ...6 Pieds du bo tier 58 Capuchon 61 Amortisseur lat ral panier 62 Amortisseur sup rieur panier 63 Amortisseur moteur 64 Patte de fixation Composants de l appareil 1 Case 2a Lid 2b Lid seal 3 Motor 4 Lon...

Страница 5: ...TO THE RUBBER HOSE LOCATED ON THE TOP OF THE LID 4HE STEP DOWN RUBBER FITTING SHOULD THEN BE INSERTED AT THE DISCHARGE SIDE OF THE ELBOW ASSEMBLY AND SECURED WITH THE PROVIDED METAL CLAMPS 4HE STEP DO...

Страница 6: ...OULD BE NO PAPER REMAINING IN THE BOWL AFTER EACH FLUSH 3 USAGE 4HE NORMAL DOMAIN OF APPLICATION OF 3 MACERATING UNITS ONLY CONCERNS THE DISPOSAL OF HUMAN WASTE TOILET PAPER AND WATER 3 4 0 IS DESIGNE...

Страница 7: ...AND OR TRANSIT DAMAGE THE AMOUNT OF WILL SUFFICE F ANY REPAIRS ARE DONE OUTSIDE THE WARRANTY PERIOD OR WHEN THE USER HAS DAMAGED THE MACERATING UNIT YOU WILL BE APPRISED OF REPAIR COSTS LL REPAIR WOR...

Страница 8: ...E MACERATING UNIT MUST BE INSTALLED AT LEAST FEET FROM THE SOIL STACK 4HIS WILL ALLOW THE MACERATOR TO OPERATE FOR AN ADEQUATE PERIOD OF TIME TO ENSURE EFFICIENT WASTE REDUCTION SOIL STACK CONNECTION...

Страница 9: ...AD ACTIVATES FTER EVACUATION THE MOTOR ENGAGES SEVERAL TIMES IN SUCCESSION BEFORE IT STOPS COMPLETELY OTOR TURNS NOISILY WITHOUT STOPPING OR PUMPING FTER EVACUATION THE MOTOR STARTS STOPS AND RE ENGAG...

Страница 10: ...N hAUTHORIZED RETURN NUMBERv FROM THE MANUFACTURER IN ORDER TO VALIDATE EXCHANGE s4HE CUSTOMER MUST PRODUCE PROOF OF PURCHASE TO VALIDATE EXCHANGE LIMITATIONS ILL AND FLUSH MECHANISM ARE GUARANTEED AS...

Страница 11: ...NALISATION DE OU POUCE DE DIAM TRE Mise en garde 0AR SOUCI DE S CURIT L ENSEMBLE BROYEUR POMPE NE DOIT JAMAIS TRE ACTIV LORSQUE LE COUVERCLE EST ENLEV 2 INSTALLATION 2 1 PR PARATION DE L ENSEMBLE BROY...

Страница 12: ...RATION Sanitop voir page 2 dessin 7c ET APPAREIL DOIT TRE VENTIL L EST CON U POUR TRE ADAPT DEUX SYST MES DE VENTILATION 0OUR CELA IL POSS DE ORIFICES SUR LE DESSUS CALOTTE DE PO ET UN TROU DE PETITE...

Страница 13: ...FACTUR S POUR LE NETTOYAGE 5NE AUTORISATION PR ALABLE DU FABRICANT EST N CESSAIRE AVANT LE RENVOI D UN APPAREIL ES APPAREILS RETOURN S SANS NUM RO D AUTORISATION DE RETOUR de MARCHANDISE SERONT RENVO...

Страница 14: ...AU MOINS TROIS PIEDS DE LA COLONNE DE RENVOI E CETTE FA ON LE BROYEUR POURRA FONCTIONNER DURANT UNE P RIODE DE TEMPS SUFFISANTE POUR R DUIRE EFFICACEMENT LE VOLUME DES D CHETS RACCORDEMENT LA COLONNE...

Страница 15: ...US LES D TAILS PORT E DE LA MAIN LORSQUE VOUS PR SENTEREZ VOTRE DEMANDE DE R PARATION AU TITRE DE LA GARANTIE OM DU PROPRI TAIRE _______________________________________________________________________...

Страница 16: ...OIT PRODUIRE UNE PREUVE D ACHAT AFIN DE VALIDER L CHANGE RESTRICTIONS ES M CANISMES DE CHASSE ET DE REMPLISSAGE DU R SERVOIR SONT GARANTIS PAR LE FABRICANT D ORIGINE SEULEMENT A PORCELAINE EST GARANTI...

Отзывы: