7
Installation and Service Manual
INSTALLATION
UNIT INSPECTION
Thoroughly inspect the unit upon delivery. Immediately report any damage that occurred during transportation to
the delivery carrier. Request a written inspection report from a claims inspector to document any necessary claim.
PRE-INSTALLATION CHECK LIST
When installing any system, first make sure the major components are available. Generally the major components
necessary for an installation are:
Pre-mix system:
CO
2
regulator set
Product connectors for Figal tank
Gas connectors for Figal tank
Beverage dispenser
Beverage tubing
CO
2
tank
Figal beverage tanks
Stepless (Oetiker) clamps
Chain for CO
2
tank
Double Check:
Do you have enough space to install the dis-
penser?
Is the countertop level?
Also consider the location of the following items before
installation:
Water line
Drain
Post mix system:
CO
2
regulator set
Beverage dispenser
Beverage tubing
CO
2
tank
Carbonator
Stepless (Oetiker) clamps
Chain for CO
2
tank
Figal system also:
Syrup connectors for Figal tank
Gas connectors for Figal tank
Figal syrup tanks
B-I-B System also:
B-I-B connectors
B-I-B regulator set
B-I-B rack
B-I-B syrup boxes
Power outlet
Heating and air conditioning ducts