pg. 19
Connecting the Wires
Open the Access Panel by removing the four screws. Locate and access the wires inside.
Carefully pull these wires a few inches outside of the access panel, to reveal 3 wires coming from
the Charging Station Head Unit (for Level-2 charging stations the color codes are Red, Black and
Green) and 3 wires from the Pedestal with the same color combination. Remove the insulation on
each wire and prepare to connect those using wire-nuts.
Match the wires using the colors (Black-Black, Green-Green & Red-Red) and connect them using
wire nuts as illustrated above. Once connected, slowly insert the wires into the device and replace
the access panel cover using the screws previously removed.
Caution
: Refer to the wire color codes (
Page 6
) and strictly adhere to this convention while
connecting the charging station and electrical supply wires. Incorrect wiring can lead to an electrical
hazard.
6) Cleaning the device
The device may be cleaned by following the instructions below:
-
Use clean soft cloth along with mild detergent to wash the
dirt off.
-
Do not use high pressure water. Pour water gently from the
top and use a wet/dry cloth to clean all the sides.
-
Never use strong detergents or any other chemicals (Acids,
petrol, thinner or any other solvent.)
-
Do not exert too much of pressure on the device while
cleaning.
-
Do not open the device.
-
Do not use a vacuum cleaner.
7) Power Up!
To power up, flip the breakers.
You have now finished the installation of your ChargePro™
620 Charging Station!
Congratulations!