![SELMI TANK 200 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/selmi/tank-200/tank-200_user-and-service-manual_1237110027.webp)
TANK
23
4.3. Installation of the machine
After carrying out the positioning operations and
connection to the electricity main, proceed with the
following operations:
•
Cleaning the supplied accessories
Attention
Make sure that no objects used during
installation have been left in the tank; if so,
remove them.
4.4. Commissioning
Check that all of the above-described procedures
were done correctly.
Check that the emergency button is not pushed; if it
is, release it.
Power-on the machine by pressing the button on the
main switch. The display on the control panel will
light up to show that the machine is in STAND-BY.
Check that the safety and emergency protections
and control devices are working correctly.
Make sure the work zone is free of all objects not
needed for work and that there are no oil stains on
the floor.
4.5.
Installation
of
the
delivery
pedal
chocolate
To connect the pedal it will be necessary to insert the
plug (1) in the socket located at the back of the
machine.
1
Содержание TANK 200
Страница 1: ...A...
Страница 2: ...B...
Страница 40: ...TANK 36 7 TECHNICAL DIAGRAMS 7 1 Technical diagrams...
Страница 41: ...TANK 37...
Страница 42: ...TANK 38...
Страница 43: ...TANK 39...
Страница 44: ...TANK 40...
Страница 45: ...TANK 41...
Страница 46: ...TANK 42...
Страница 47: ...TANK 43...
Страница 48: ...TANK 44...
Страница 49: ...TANK 45...
Страница 50: ...TANK 46...
Страница 51: ...TANK 47...