![SELMI TANK 200 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/selmi/tank-200/tank-200_user-and-service-manual_1237110026.webp)
TANK
22
4. Installation section
4.1. Positioning
Warning
Before positioning the machine check that the
machine, the associated accessories and the
parts supplied separately have not been
damaged during transportation.
It is the task of the Client to make sure that the
strength of the supporting surface, at the point of
installation, is adequate for the weight of the
machine.
The flooring at the point of installation must be
sufficiently level.
Isolate the machine from any potential vibrations
coming from other nearby machinery.
In the case where the machine or any of the
associated accessories are found damaged it is
important to alert the manufacturer of the found
anomaly so as to agree on the actions to be taken.
Attention
The machine must be placed on a level
surface;
for
the
other
environmental
requirements
necessary
for
optimal
functioning of the machine please see
sections 1.11 and
2.5..
4.2. Electrical connections
Attention
The connection of the machine to the
electrical system must be carried out by
personnel observing the legislation in force;
the characteristics of the electrical connection
must be compatible with the electrical
specifications of the machine which can be
found in the relevant section or on the
apposite plaque on the door of the electric
panel.
Attention
If the machine has been purchased to be
powered by a three phase line, make sure that
in the socket there is a connection to the
neutral wire. This is necessary for the
functioning of the machine.
Attention
Before starting any procedure make sure that
there are no objects inside the tank.
Attention
This operation should be carried out by a
technician or by a maintenance electrician.
Connection to the pneumatic system must be made
using a quick fitting with closure valve; this fitting
must be compatible in size with that installed on the
machine.
The first time the machine is used, the pneumatic
connection must be made by qualified personnel.
When connecting the machine to the electrical
system via a three phase line, check the direction of
rotation as follows:
1) plug in the machine
2) verify that the emergency stop button is not
pressed and, if this is the case, reset it
3) close the upper protective panel
4) Choose the manual mode
5) Start the mixer
Warning
The machine can work only if the tank mixer is
rotating anticlockwise when observed from
above.
If the rotation direction is wrong, it is necessary to
act as follows:
1) Stop the mixer
2) turn off the machine by pushing the red
button on the main switch
3) disconnect the plug, open it and swap the
position of the two black wires n°2 with n°3,
paying attention not to disconnect the other
wires
Attention
This operation should be carried out by a
technician or by a maintenance electrician.
If the mixer is rotating in the correct direction carry
out the following steps:
1) close the upper protective panel
2) Choose the manual mode
3) Start the mixer
After checking the direction of rotation, it is
necessary to check that the pneumatic system has
been correctly connected to the machine with the
quick fitting. After completing these checks,
continue the installation operations as described in
the following sections.
Warning
Don’t run the pump without product inside the
tank.
Содержание TANK 200
Страница 1: ...A...
Страница 2: ...B...
Страница 40: ...TANK 36 7 TECHNICAL DIAGRAMS 7 1 Technical diagrams...
Страница 41: ...TANK 37...
Страница 42: ...TANK 38...
Страница 43: ...TANK 39...
Страница 44: ...TANK 40...
Страница 45: ...TANK 41...
Страница 46: ...TANK 42...
Страница 47: ...TANK 43...
Страница 48: ...TANK 44...
Страница 49: ...TANK 45...
Страница 50: ...TANK 46...
Страница 51: ...TANK 47...