![Sega THE HOUSE OF THE DEAD III DELUXE Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/sega/the-house-of-the-dead-iii-deluxe/the-house-of-the-dead-iii-deluxe_operators-manual_1233601021.webp)
12
www.seuservice.com
13
www.seuservice.com
ASSEMBLING THE CABINET
FIG. 6. 2 a
There are 4 cord clamps in the PTV front.
By using the 4 cord clamps, secure the
wiring as per the Figure. (FIG. 6. 2 b)
Mount the PTV onto the PTV Cabinet.
Lift the PTV by 3 or more workers while
another worker supporting the PTV
Cabinet. Be careful so as not to damage
wiring at this time.
For performing work,
use 4 or more workers.
FIG. 6. 2 b
FIG. 6. 2 c
Move the PTV to the rear of the PTV Cabinet.
Connect wiring between the PTV and the PTV Cabinet.
Connect the Connector.
Connect the Connector.
2
1
2
3
4
Содержание THE HOUSE OF THE DEAD III DELUXE
Страница 2: ...VISIT OUR WEBSITE...
Страница 8: ...This page left Blank...
Страница 92: ...84 www seuservice com COIN DOOR...
Страница 102: ...94 www seuservice com ASSY PTV BASE DX D 1 2 Direction of the connector Downward...
Страница 106: ...98 www seuservice com ASSY BILLBOARD DX D 1 2 Opposite side...
Страница 112: ...SEGAAMUSEMENTS USA INC...