10
•
If it welds early or not at all adjust the foot pedal cable to achieve this setting.
•
Place the repair tools in the front cover pockets.
•
Connect mains lead into the sockets at rear of machine.
•
Check voltage switch on the machine back is showing the corresponding voltage to
your mains supply.
•
IMPORTANT NOTE: If voltage is wrong, DO NOT proceed with installation
and DO NOT switch the machine on. Contact SEETRAX or your local
SEETRAX Distributor. If the voltage is correct SWITCH ON O/I. See Figure 2,
page 20).
•
Adjust the Work Light position.
•
YOUR CIR-KIT WELD 450 IS NOW READY TO WORK!!
•
PLEASE TURN TO OPERATING INSTRUCTIONS - PART 1, page 12.
Содержание CIR-KIT WELD 450
Страница 1: ...1 CIR KIT WELD 450 TRACK WELDING MACHINE INSTRUCTION MANUAL ...
Страница 11: ...11 MICROSCOPE INSTRUCTION MANUAL ...
Страница 20: ...20 FRONT PANEL PART NUMBER 1055 Figure 2 ...