11
Safety Information
Information presented here is vital to all personnel and please also read the UPS
safety manual.
Storage and Transportation
Please handle with extreme caution since a high amount of energy is contained with the batteries. Always
keep the unit in position as marked on the packaging and never drop the unit.
Installation
If flammable substances such as gases or fumes are present or if the room is airtight, a safety hazard
situation exists, in which no electrical equipment should be operated.
The instructions in this manual explain how to install the UPS safely. Not acknowledging such electrical
hazards may be fatal, so keep this manual for all future reference.
WARNING!
It is strongly advisable not to open the UPS cabinet as the components have very high voltage
and touching them may be fatal. Only a technician from the manufacturer or an authorized
agent may service the unit.
This UPS unit’s output receptacles carry live voltage even when not connected to a power
supply as it has its own energy source
.
User’s operations
The only operations that users are permitted to do are:
l
Turning the UPS unit on and off
l
Operating the users interface
l
Connecting data interface cables
l
Changing the batteries
All such operations are to be performed exactly as instructed in this manual. The greatest care possible
must be taken for any of these operations and any change thereof may prove very hazardous to the
operator.
Содержание ROLINE ProSecure II 1000 VA
Страница 1: ...I ROLINE ProSecure II 700 1000 1500 2000 3000VA Standger t 19 Rack 1HE 2HE Bedienungsanleitung...
Страница 13: ...7 Installation der Rack Mount Typen Installation mit unteren Schienen Installation mit hinterem B gel...
Страница 14: ...8 R ckseitenansichten...
Страница 15: ...9...
Страница 30: ...ProSecure II 700 VA 3000 VA UPS User s and Installation Manual...
Страница 43: ...13 Installation of Rack mounted types Installation with bottom bracket Installation with rear bracket...
Страница 44: ...14 Rear panel views PROSECURE II 700 1 5KVA REAR PANEL PROSECURE II 2 3KVA REAR PANEL...