SL-C510-AIS
Compact 5-9NM Solar Marine Lantern
Latest products and information available at
www.sealite.com
75
Maintenance & Servicing
Designed to be almost maintenance-free, the SL-C510 with AIS requires minimal attention, though the
following maintenance and servicing information is provided to help ensure the life of your Sealite product.
1. Cleaning Solar Panels- Occasional cleaning of the solar panels may be required. Using a cloth and
warm soapy water, wipe off any foreign matter before rinsing the panels with fresh water.
2. Battery Check- Inspection of batteries should be performed every three years (minimum) to ensure
that the charger, battery and ancillary electronics are functioning correctly. Using a voltage meter,
check that the battery voltage is at least 12 volts under 100mA load and ensure all terminals are clear
of foreign matter.
3. O-Ring Check- Inspect the condition of the O-ring for damage, wear or if it is brittle. Replace if
necessary. The O-ring should be a rubber texture to ensure a complete and even seal.
Replacing the Battery
The SL-C510 with AIS has an internal battery compartment, which provides the user with the ability to
change the battery after years of operation. Contact Sealite should a replacement battery required.
1. Remove the four socket-head screws on the light assembly and separate the SL-C510 with AIS light
assembly from the body/base section.
2. Switch the ON/OFF switch to the OFF position.
3. Disconnect the light head, battery cable, data cable and GPS antenna from the light head assembly.
2. Light Head
Power Cable
Battery
Connection
Programming
Port
1. Data Cable
4. GPS Antenna Cable
On/Off Switch
CAUTION
Make sure On / Off switch is in Off position.
3. Light Head Power
Connector