![Seagull Models P-26A PEASHOOTER Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/seagull-models/p-26a-peashooter/p-26a-peashooter_assembly-manual_1223418015.webp)
15
.
Trim and cut.
3/32” Hole.
INSTALLING THE STOPPER
ASSEMBLY.
1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon
tubes leaving 1/2” protruding from the
rear of the stopper. This will be the fuel
pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of
the line to the weighted fuel pick up and
the other end to the nylon pick up tube.
.
Switch.
INSTALLING THE ENGINE SWITCH.
Trim and cut.
Switch.
Vent tube.
Fuel fill tube.
Fuel pick up tube.
3) Carefully bend the second tube up at a 45º
angle. This tube is the vent tube.
Содержание P-26A PEASHOOTER
Страница 8: ...P 26A Peashooter Instruction Manual 8 TOP VIEW BOTTOM VIEW Epoxy Epoxy Epoxy ...
Страница 9: ...9 INSTALLING THE MAIN LANDING GEAR Epoxy ...
Страница 10: ...P 26A Peashooter Instruction Manual 10 2mm 3x15mm Fill Epoxy C A glue ...
Страница 13: ...13 Collar Collar Collar ...
Страница 18: ...P 26A Peashooter Instruction Manual 18 M5x90mm Use thread locker glue for each blind nut ...
Страница 20: ...P 26A Peashooter Instruction Manual 20 DUMMY ENGINE ...
Страница 21: ...21 COWLING Epoxy M3x15mm ...
Страница 22: ...P 26A Peashooter Instruction Manual 22 M3x15mm Mark and drill hole as shown to adjust gasoline clock ...
Страница 30: ...P 26A Peashooter Instruction Manual 30 Nose wheel steering arm Metal clevis 725mm M2 clevis M2 lock nut Epoxy ...
Страница 32: ...P 26A Peashooter Instruction Manual 32 ...
Страница 33: ...33 BOTTOM VIEW ...