CHRISTEN HUSKY
Instruction Manual.
22
Rudder control horn.
4) When you are sure that everything is
aligned correctly, mix up a generous amount of
Flash 30 Minute Epoxy. Apply a thin layer to the
mounting slot and to bottom of the vertical sta-
bilizer mounting area. Apply epoxy to the bot-
tom and top edges of the filler block and to the
lower hinge also. Set the stabilizer in place
and realign. Double check all of your measure-
ments once more before the epoxy cures. Hold
the stabilizer in place with T-pins or masking
tape and remove any excess epoxy using a
paper towel and rubbing alcohol. Allow the ep-
oxy to fully cure before proceeding.
Epoxy.
ELEVATOR AND RUDDER PUSHROD
HORN
INSTALLATION.
M2 lock nut.
M2 clevis.
600mm.
M3 Clevis.
Crimp.
Metal connector.
Cable end.
Содержание Husky
Страница 18: ...CHRISTEN HUSKY Instruction Manual 18 ...
Страница 23: ...23 www seagullmodels com INSTALLATION TAILWHEEL 1 Locate the items for this section of the manual ...
Страница 28: ...CHRISTEN HUSKY Instruction Manual 28 Screw 3 x 10mm ...
Страница 29: ...29 www seagullmodels com M2 lock nut M2 clevis 600mm ...