Installation
ST94-21 C/Ku-Band TVRO
3-8
16.
Mount the feed assembly with the Linear
drive motor at the bottom strut.
Linear Drive Motor
Bottom Strut
17.
Assemble the Feed Assembly to the feed
struts, aligning the labels on the end of the
feed strut to the label on the feed assembly.
18.
Keep the assembled reflector/feed assembly
mounted on the reflector support structure
until you are ready to install it on the
Pedestal.
Note:
You will install the reflector later in the
installation instructions.
3.6.
Unpacking the Pedestal Crate
The Pedestal crate contains the Pedestal Assembly, Spider, DAC & BDE box, RF units, Wave Guide boxes, Hardware Kits
and the Air Conditioning unit if one is with the shipment. If there are two RF units the Wave Guide and hardware for
each is in separate boxes.
Unpacking the Pedestal Crate:
1.
Open the crate, to expose the contents, as
described above.
2.
Cut the bands holding the Balance Weight
Box along with the Hardware and
Miscellaneous Box. Stage these items in the
location where the Pedestal will be
assembled.
3.
Cut the band holding the Hardware to
assemble Pedestal to Spider. Assure that this
hardware stays with the mounting spider.
4.
Cut the remaining restraints and remove the
mounting spider. Stage it with the location
where the base frame will be assembled.
5.
Cut the bands holding the DAC and BDE Box
(pictured in center). Stage this box where
the Below Decks Equipment is temporarily
located.
EAR Controlled - ECCN EAR99
Содержание ST94-21
Страница 4: ...EAR Controlled ECCN EAR99 ...
Страница 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 14: ...Introduction ST94 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 22: ...Site Survey ST94 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 54: ...Installation ST94 21 C Ku Band TVRO 3 32 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 66: ...Setup Home Flag Offset ST94 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 74: ...Setup Searching ST94 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 118: ...Model ST94 21 Drawings ST94 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 123: ...EAR Controlled ECCN EAR99 ...
Страница 126: ...EAR Controlled ECCN EAR99 ...
Страница 139: ...EAR Controlled ECCN EAR99 ...
Страница 140: ...EAR Controlled ECCN EAR99 ...
Страница 141: ...EAR Controlled ECCN EAR99 ...