ST94-21 C/Ku-Band TVRO
Installation
3-29
If any of these steps fail, or the ACU reports model "xx97", re-configure the PCU as described in the Setup
section of this manual. If initialization still fails, this indicates a drive or sensor problem, refer to the
Troubleshooting section.
3.16.2.
Home Flag Position
Note the approximate position of the antenna relative to the bow of the ship while it is at the home switch
position. This information will be used later to calibrate the relative position display of the antenna.
3.16.3.
BDE
Turn Power ON to the ACU. Record the power-up display, Master (ACU) Model & Software version and the
Remote (PCU) Model & Software version.
3.16.4.
Balancing the Antenna
The antenna and equipment frame are balanced at the factory however, after disassembly for shipping or
maintenance, balance adjustment may be necessary. The elevation and cross-level motors have a brake
mechanism built into them, therefore, power must be ON to release the brakes and
DishScan®
and
antenna drive must be OFF to balance the antenna. . Do NOT remove any of the drive belts. Balancing
is accomplished by adding or removing balance trim weights at strategic locations to keep the antenna from
falling forward/backward or side to side. The antenna system is not pendulous so 'balanced' is defined as the
antenna remaining at rest when left in any position.
The “REMOTE BALANCE” parameter (located at the end of the Remote Parameters after REMOTE TILT) of the
ACU. When enabled, Remote Balance Mode temporarily turns DishScan, Azimuth, Elevation and Cross-Level
drive OFF. This function is required when trying to balance antenna systems that have a built-in brakes on
the elevation and cross-level motors.
Assure that Antenna power is ON and that the antenna has completed initialization.
At the ACU:
1.
From the ACU - REMOTE BALANCE parameter: Enable balance mode (refer to your ACU manual).
The screen should now display “REMOTE BALANCE ON”.
At the Antenna:
2.
At the Antenna: Balance the antenna with the elevation near horizon (referred to as front to back
balance)
by adding, or subtracting, small counter-weights
.
3.
Then balance Cross Level axis (referred to as left-right balance)
by moving existing counter-
weights from the left to the right or from the right to the left
. Always move weight from
one location on the equipment frame to the same location on the opposite side of the equipment
frame (ie from the top left of the reflector mounting frame to the top right of the reflector
mounting frame). Do NOT add counter-weight during this step.
4.
Last, balance the antenna with the elevation pointed at, or near, zenith (referred to as top to bottom
balance)
by moving existing counter-weights from the top to the bottom or from the
bottom to the top
. Always move weight from one location on the equipment frame to the same
location on the opposite side of the equipment frame (ie from the top left of the reflector
mounting frame to the bottom left of the reflector mounting frame). Do NOT add counter-weight
during this step.
5.
When completed, the antenna will stay at any position it is pointed in for at least 5 minutes (with no
ship motion).
6.
Do NOT cycle antenna power to re-Initialize the antenna. Return to the ACU, which is still in
REMOTE BALANCE mode, and press ENTER to exit Remote Balance Mode. When you exit Balance
Mode the antenna will be re-initialized, which turns DishScan®, Azimuth, Elevation and Cross-Level
drive ON.
3.16.5.
Fine Balance and Monitoring Motor Drive Torque
The DacRemP
DISPTC
graph chart provides a means for monitoring torque commands required for each
motor for diagnostic purposes and verifying antenna balance. By observing each trace, the required drive of
the antenna via the motor driver PCB may be established.
•
To view the Torque Commands, select the
graph chart.
EAR Controlled - ECCN EAR99
Содержание ST94-21
Страница 4: ...EAR Controlled ECCN EAR99 ...
Страница 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 14: ...Introduction ST94 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 22: ...Site Survey ST94 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 54: ...Installation ST94 21 C Ku Band TVRO 3 32 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 66: ...Setup Home Flag Offset ST94 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 74: ...Setup Searching ST94 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 118: ...Model ST94 21 Drawings ST94 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 123: ...EAR Controlled ECCN EAR99 ...
Страница 126: ...EAR Controlled ECCN EAR99 ...
Страница 139: ...EAR Controlled ECCN EAR99 ...
Страница 140: ...EAR Controlled ECCN EAR99 ...
Страница 141: ...EAR Controlled ECCN EAR99 ...