ST94-21 C/Ku-Band TVRO
Installation
3-11
3.8.
Assembling the ADE
3.8.1.
Preparing for Assembly of the ADE
Read this entire assembly procedure before beginning.
Refer to the System Block diagram, General Assembly, Baseframe Assembly, Radome Assembly and Radome
Installation Arrangement drawings for your system.
Select a secure assembly site that provides enough area to work with the large radome panels while sub-
assembling the baseframe, sections of the radome, Antenna Pedestal and Reflector & Feed. The area should
be a clean, flat location, free of rocks & debris (ie concrete). The site should also provide protection from
wind, rain and other adverse weather. A hoist, or small crane, is needed to assemble these sub-assemblies to
form the final ADE Assembly.
As an example, you might sub-assemble everything on the pier where the ship will tie up, then use the crane
to put the sub-assemblies together and lift the whole ADE up to the mounting location on the ship.
You can change order of these steps, however, in the end the objective is to have a well sealed
radome with flanges that are clean of excess caulking. In addition it is important that the ADE is
structurally sound for severe weather conditions.
3.8.2.
Sub-assemble the Base Frame Assembly
Refer to the Base Frame Assembly drawing for your system and the procedure below.
NOTE:
Unless otherwise indicated, all nuts and bolts should be assembled
with Loctite 2760 or its equivalent.
WARNING:
Assure that all nut and bolt assemblies are tightened according to
the tightening torque values listed below:
SAE Bolt Size
Inch Pounds
Metric Bolt Size
Kg-cm
1/4-20
75
M6
75.3
5/l6-18
132
M6
225
3/8-16
236
M12
622
1/2-13
517
6.
Place the radome base frame
on temporary support blocks,
or jack stands, at least 22
inches high.
7.
Loosely assemble the eight
legs, eight interior braces and
four outer braces from the
underside of the radome base
frame to the second hole in
the bottom end of the legs
using the hardware provided.
Insure that a split washer is
used under each nut.
8.
Assure that the legs and
braces are correctly
assembled.
EAR Controlled - ECCN EAR99
Содержание ST94-21
Страница 4: ...EAR Controlled ECCN EAR99 ...
Страница 10: ...Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 14: ...Introduction ST94 21 C Ku Band TVRO 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 22: ...Site Survey ST94 21 C Ku Band TVRO 2 8 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 54: ...Installation ST94 21 C Ku Band TVRO 3 32 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 66: ...Setup Home Flag Offset ST94 21 C Ku Band TVRO 7 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 74: ...Setup Searching ST94 21 C Ku Band TVRO 9 6 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 118: ...Model ST94 21 Drawings ST94 21 C Ku Band TVRO 15 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99 ...
Страница 123: ...EAR Controlled ECCN EAR99 ...
Страница 126: ...EAR Controlled ECCN EAR99 ...
Страница 139: ...EAR Controlled ECCN EAR99 ...
Страница 140: ...EAR Controlled ECCN EAR99 ...
Страница 141: ...EAR Controlled ECCN EAR99 ...