60
7.
Using a 6 mm hex key, loosen and remove the Cap Screw (G) that
secures the Crank Link Assembly (F) to the Pulley spindle. Remove the
old Crank Link Assembly and discard.
8.
Installation is the reverse procedure.
Put the replacement Crank Link Assembly (F) in position on the Pulley
spindle and completely tighten the Cap Screw (G), or torque to 40 N.m.
Make sure the Crank Link Assembly is secure on the Pulley
spindle before you reinstall the Linkage Arm.
Put the Right Shroud in position first to align the screws for the Left
Shroud. Install the top screws first.
NOTICE:
Be sure the tabs in the Top Shroud snap into the Main
Assembly.
Completely tighten the Cap Screw (A) on the Crank Arm (B) or torque to
60 N.m.
The Left Crank Arm has an “L”, the Right Crank Arm an “R.
Orientation is based from a seated position on the bike. Make
sure the Crank Arms are secure before you exercise.
9.
Final Inspection
Inspect your machine to ensure that all hardware is tight and components
are properly assembled.
D
o not use until the machine has been fully assembled and
inspected for correct performance in accordance with the
Owner’s Manual.
A
C
B
(60 N.m)
G
(40 N.m)
F