Da
te
C
ode
20
011
009
SEL
-701-1 Monitor
Co
mm
is
sio
n
in
g
Se
le
ct
ed
F
un
cti
on
al T
es
ts
6.
10
Figure 6.4
Two Voltage Source and Three Current Source Test Connections
Monitors equipped with ac voltage inputs (Models 0701101X and 0701111X) must be properly grounded for accurate voltage
measurement.
+
–
VAB
IA
+
–
VCB
IB
+
–
V
IC
Two Voltage and Three Current Sources
E01
IA
E02
E04
E05
E07
E10
E11
D06
D07
D08
D09
IB
IC
IN
VA
VB
VC
N
Relay Phase Current (5A) and Voltage Inputs (DELTA_Y = D)
E08
D10
Содержание SEL-701-1
Страница 16: ...This page intentionally left blank ...
Страница 18: ...This page intentionally left blank ...
Страница 20: ...This page intentionally left blank ...
Страница 34: ...This page intentionally left blank ...
Страница 118: ...This page intentionally left blank ...
Страница 142: ...This page intentionally left blank ...
Страница 196: ...This page intentionally left blank ...
Страница 210: ...This page intentionally left blank ...
Страница 242: ...This page intentionally left blank ...
Страница 384: ...This page intentionally left blank ...
Страница 440: ...This page intentionally left blank ...
Страница 452: ...This page intentionally left blank ...