Revision: 3.0
Page 35 of 70
10.
Mounting instructions
10.1.
General
Always install the SchwankControl in such a way that no vibrations or shocks can be transmitted.
Follow the wiring diagram for installation. Pay particular attention to the phase-correct connection
of L and N, as the control is only single-phase fused.
Install the room temperature sensor in the radiation range of two gas infrared heaters at a height of
2.5 m. This gives the control an optimum value for the actual temperature.
If you install the controller in a particularly large hall or in a hall with an extreme temperature
gradient, you can calculate an average value for each zone instead of using a single temperature
sensor.
10.2.
Battery
Button cell Lithium CR2032 3V
Battery replacement necessary after approx. 5 years [current date and time are no longer displayed]
10.3.
Fuse
Microfuse 5x20mm FLINK 6.3A
10.4.
Tools
Address switch, unlock PCB terminals:
Long, narrow screwdriver
Sheathed cables, single core insulation:
Stripping tool
Cable breakthroughs:
Drill or punching tool
Wall mounting:
Drill
10.5.
Cable types and board wiring
The following diagrams provide basic wiring instructions.
In a separate document
"Schwank- Electrical Compendium"
you will find extensive and detailed wiring
diagrams.
Содержание 40660000
Страница 39: ...Revision 3 0 Page 38 of 70...
Страница 40: ...Revision 3 0 Page 39 of 70...
Страница 41: ...Revision 3 0 Page 40 of 70...
Страница 54: ...Revision 3 0 Page 53 of 70 10 10 Characteristic sensor curves 10 10 1 Temperature sensor...
Страница 55: ...Revision 3 0 Page 54 of 70 10 10 2 Humidity sensor...
Страница 58: ...Revision 3 0 Page 57 of 70 11 4 2 Wiring for converter MODBUS RTU KNX Comes with the adapter in printed form...
Страница 67: ...Revision 3 0 Page 66 of 70 13 EU Declaration of Conformity...