![SCHUNK VERO-S NSL3 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/schunk/vero-s-nsl3/vero-s-nsl3_assembly-and-operating-manual_1215842026.webp)
Assembly
26
03.00 | NSL3 | VERO-S quick-change pallet system | en | 1155408
screw. Supply occurs either via a pneumatic plug connection G1/8"
8/6 or a sealing nipple for locking couplings type NW 7.4
(accessory). The clamping station can be retrofitted at the
connection points using a separately available connecting strip
(accessory).
Reduced material
thickness in marked
areas
Bore holes permitted in shaded areas
NSL3 400
4.3.6 NSL3 600
The clamping station can be clamped directly onto the machine
table via screws. Permitted areas for appropriate bore holes can
be found in the attached bore hole drawings. Optionally, BRR 50
clamp banks can be purchased. There are already 4 mounting
holes at a distance of 200 x 200. The mounting points are located
in the middle between the clamping modules. Size M10 screws can
be used at the additional mounting points to achieve a more rigid
set-up when using clamps. There are two alignment grooves on
the bottom of the clamping station to mount T-nuts used for
aligning the clamping stations on the machine table. These allow
for precise alignment along an alignment groove. The NSL3 600 is
equipped with two interconnected G 1/8" air connections for