Maintenance and repair work
128
05.00 | LDT | Montage- und Betriebsanleitung | en | GAS360927
Check the initial
tension
NOTICE
After adjusting the rollers check the entire track to ensure all of
the rollers are free from play.
Track width
1. Apply marking paste to all guideways.
2. Move the guided slides.
3. Check the running track width – track width B = 4 – 5.3mm.
7.8 Changing the stroke measuring system
NOTICE
•
Due to the adjustment work required, the stroke measuring
system should only be changed by specialist personnel.
7.8.1 Main components
Different measuring systems are used in the drives. This operating
manual describes two measuring systems.
• LE 100
• TTK70
For more information on the optical stroke measuring systems,
refer to the separate operating manuals.
Содержание LDT Series
Страница 1: ...Montage und Betriebsanleitung Assembly and Operating Manual...
Страница 4: ...2 05 00 LDT Montage und Betriebsanleitung GAS360927 deutsch 3 english 78...
Страница 5: ...Original Betriebsanleitung Montage und Betriebsanleitung LDT Linearmotorachse...
Страница 44: ...Montage 42 05 00 LDT Montage und Betriebsanleitung de GAS360927 Pneumatikplan Pneumatikplan f r Haltebremsen...
Страница 80: ...Translation of the Original Operating Manual Assembly and Operating Manual LDT Linear motor shaft...
Страница 119: ...Assembly 05 00 LDT Montage und Betriebsanleitung en GAS360927 117 Pneumatic diagram Pneumatic diagram for holding brake...
Страница 155: ......