1.6. Commitment of the Staff

Only people who give reason to expect that they will reliably do their job are allowed. Persons whose ability to react is 
affected, for example by drugs, alcohol or medication, are NOT allowed.

Every person that is involved in the mounting of FS Uno must have read and understood these Mounting Instructions, 
especially chapter "1.4 Safety Precautions", as well as all relevant chapters regarding the corresponding operations.

These Mounting Instructions should always be kept available and easily accessible for all persons involved.

• 

Only trained and instructed qualified personnel are allowed to execute the operations mentioned in this instruction manual.

Staff that still is to be trained may only mount the FS Uno system under the supervision of an experienced person.

1.7. Training of the Staff

These Mounting Instructions are addressed to personnel qualified in the areas of transportation and loading, mounting, 
disassembly and disposal, having the following qualifications:

The professional staff members must be capable of fulfilling the tasks they have been assigned with and must be able to 
realize and avoid dangers on the basis of their professional formation, experience, expertise and their specific know-
ledge of the relevant regulations.

The qualified staff members must have the required knowledge of the guidelines regarding safety, accident prevention 
and environmental protection, as well as of loading and unloading regulations that apply at the respective construction site.

• 

The qualified personnel have the driving licenses required at the specific construction site to be able to drive site vehicles
and operate construction machines.

We recommend the operator to insist on a confirmation in writing in each case.

1.5. Obligation of the Plant Owner / Operating Company

The plant owner ensures that all parts of these Mounting Instructions are stored readily available and handy at the plant.

The plant owner/operating company undertakes to only let people work at and in the striking distance of the plant who

have read and understood the parts of the mounting instruction that are relevant for the respective operations,

are familiar with the fundamental regulations on work safety, accident prevention and protection of the environment

and have been instructed in the safe handling of the plant (training course).

Before starting any mounting works, the plant owner/operating company designates

a supervising person and ensures that

the construction site is inspected using plans showing all supply lines (water, electricity, gas) and thus

the position of all underground supply lines and unstable ground without sufficient load-bearing capacities are marked 
properly or sealed off with barriers.

Schletter Solar GmbH – Alustraße 1 – 83527 Kirchdorf 

Mounting instruction 

FS UNO

 with SRF Foundation Posts

 | 2016.09 V.00

4

 

Содержание FS Uno

Страница 1: ...FS DUO 400224EN V4 INSTALLATION MANUAL 202011 1 SCHLETTER SOLAR GMBH SUBJECT TO MODIFICATIONS FS UNO INSTALLATION MANUAL with SRF Foundation Posts...

Страница 2: ...elements for module clamps 15 3 4 8 Screws for standard module clamps 16 3 4 9 Auxiliary equipment accessories 16 4 Mounting information 17 4 1 Terrain 17 4 2 Foundation 18 4 2 1 Ramming pile driving...

Страница 3: ...t of these Mounting Instructions is the intellectual property of Schletter GmbH and is subject to the German copyright law Any reproduction editing distribution transfer to third parties in whole or i...

Страница 4: ...ot taken CAUTION indicates that minor personal injury can result if proper safety precautions are not taken DANGER due to operations with electricity Electric power can lead to serious accidents and c...

Страница 5: ...t from that please consider the applicable rules and regulations on accident prevention and environmental protection that apply at the respective installation site as well as the work instructions and...

Страница 6: ...d knowledge of the guidelines regarding safety accident prevention and environmental protection as well as of loading and unloading regulations that apply at the respective construction site The quali...

Страница 7: ...ent safety shoes hard hat safety glasses protective gloves and reflective vest when unloading the FS Uno components Besides also wear the personal protective equipment that is specified in your intra...

Страница 8: ...riting without undue delay A notification shall not be unduly delayed if it has been made within two weeks the timely dispatch of this notification shall be deemed sufficient to meet the deadline Rega...

Страница 9: ...Optional Rack mounting Optional Complete module assembly Module types Framed modules with a frame thickness of up to 50 mm Unframed modules on request 3 Technical data 3 1 System description and prope...

Страница 10: ...30 DIN933 flange nut M12 DIN6923 and washer M12 DIN9021 Fastening device Module clamp adapter Drill screw Fig 3 3 2 detail 3 3 Systems overview Detail Fig 3 3 1 system visualisation Detail Strut assem...

Страница 11: ...purlin connector Gen2 kit Fig 3 4 2 1 144999 008 Fig 3 4 2 2 144999 003 Fig 3 4 2 3 144901 001 Fig 3 4 1 1 143006 200 3 4 3 Strut assembly 144970 099 Strut assembly SRF 000022 235 Strut element SRF 00...

Страница 12: ...ustom cut 144303 100 FS Uno girder assembly 3H custom cut 144304 100 FS Uno girder assembly 4H custom cut 144305 100 FS Uno girder assembly 5H custom cut 144306 100 FS Uno girder assembly 6H custom cu...

Страница 13: ...39 mm 144912 039 144910 003 144911 039 131001 039 131002 000 40 mm 144912 040 144910 003 144911 040 131001 040 131002 001 300001 040 130002 001 41 mm 144912 041 144910 003 144911 041 131001 041 131002...

Страница 14: ...001 300001 040 130002 001 41 mm 131001 041 131002 001 130001 041 130002 001 42 mm 131001 042 131002 001 130001 042 130002 001 43 mm 131001 043 131002 001 130001 043 130002 001 44 mm 131001 044 131002...

Страница 15: ...With big order quantities clamps for other module thicknesses can be manufactured on request The Standard clamps are not pre assembled when they are delivered These clamps are combined with a hexagon...

Страница 16: ...terranean cables etc Weather conditions wind rain snow etc Conditions that may influence the building ground seismic activities erosion etc Geo technical reports about the topology of the site and the...

Страница 17: ...d affect the adhesive force of the piles must be documented e g slant position deceleration and subsequent sudden acceleration of the penetration speed swift penetration of the foundation pile while p...

Страница 18: ...Pile driver with suitable ram Spirit level Torque wrench 30 Nm to 60 Nm Wrench socket size 17 Wrench socket size 19 Hammer Club hammer to hold against the connector hook Plastic tip hammer Angle meter...

Страница 19: ...Square nut DIN557 M8 A4 15 Nm H and V in com bination with module clamp adapter Hexagon socket screw DIN912 M8 A2 25 45 mm 8 Nm V TX stud screw M8 A2 GMB 42 5 55 mm 15 Nm H and V in com bination with...

Страница 20: ...st and safety shoes Always keep looking on the machine and the surrounding area Please especially pay attention to mechanically moving parts in the danger area of the ramming machine to avoid crushing...

Страница 21: ...ing their corresponding tolerances see item 5 1 step 1 S N E W Fig 5 1 3 flush alignment of the foundation posts Fig 5 1 4 detailed view of the foundation post from above 3 3 Detail Detail Schletter S...

Страница 22: ...the girder assembly 1 1 CAUTION Wear adequate protective equipment especially a hard hat when mounting the girder assembly Secure all parts that need to be fastened against slipping Use appropriate a...

Страница 23: ...an imprecise mounting the modules could fall down in the worst case CAUTION Wear adequate protective equipment especially a hard hat when mounting the module bearing rails Secure all parts that need...

Страница 24: ...screws to avoid contact corrosion After positioning the module clamp adapter please clean the module bearing rails with a hand brush or cover the module bearing rail during the screwing process e g wi...

Страница 25: ...in the designated hollow space notch with a self drilling screw to the module bearing rail Fig 5 6 1 snapping in the module clamp adapter Fig 5 6 2 fastening the module clamp adapter 1 1 2 2 Schlette...

Страница 26: ...GmbH thus points out that the safety notices and mounting instructions of the module manufacturer are to be observed And please also note the notices given in these Mounting Instructions when mounting...

Страница 27: ...the clamp observe the clearance Fasten hex socket screw with a torque of 8 Nm 8 Nm Fig 6 1 1 attaching the module clamp Fig 6 1 2 pushing sliding the module towards the clamp Fig 6 1 3 fastening the h...

Страница 28: ...le clamp into the rail of the module clamp adapter Push the module towards the clamp observe the clearance Fasten hex socket screw with a torque of 15 Nm 15 Nm Fig 6 2 1 clicking in the module clamp F...

Страница 29: ...lamping to the inner module bearing rails at the short module side comparable to clamping in the case of horizontal module arrangement Fig 6 3 1 combined module clamping Fig 6 3 2 upper and lower modu...

Страница 30: ...pose of the components in accordance with the local regulations Fig 7 1 general recycling symbol WARNING Always wear protective equipment safety shoes hard hat safety glasses protective gloves and ref...

Страница 31: ...ge or consequential damage that is due to one or several of the causes mentioned above The Mounting Instructions as well as the maintenance instructions in combination with a warranty extension refer...

Страница 32: ...0 0 SCHLETTER SOLAR GMBH Alustrasse 1 83527 Kirchdorf GERMANY www schletter group com We reserve the right to changes including technical modification...

Отзывы: