33
5. Assembly steps
5.1. Pile-driving of foundation posts and applying corrosion protection
A zinc dust primer is to be used
to coat the top 30 mm of the
foundation post, inside and
outside.
Fig. 5.1.-1 (pile-driving tolerances)
Fig. 5.1.-2 (prime-coated foundation post)
1.
Pile-drive the foundation post
according to the indicated
tolerances
Height tolerance of the piles to
each other:
± 30 mm
Tolerance of pile tilt in N-S and
E-W direction:
± 3°
Tolerance of the pile height
according to terrain topography:
± 100 mm
1.
2.
2.
WARNING
•
Wear adequate protective equipment during the pile-driving operations, especially ear protection
and protective gloves, refl ective vest and safety shoes!
•
Always keep looking on the machine and the surrounding area.
•
Please especially pay attention to mechanically moving parts in the danger area of the ramming
machine to avoid crushing injuries.
•
Prevent the ramming machine from toppling over by exclusively driving on adequate, stable ground!
Check the stability and fi rm embedment of the pile-driven foundations before mounting the racks!
Only a special paint (
zinc dust primer
) will give the required protection and is approved according to the
standards. Basic zinc spray coatings do not provide long-term protection.
The tolerances specifi ed here must not be exceeded!
The exact positions of the foundation posts can be referenced in the corresponding
pile-driving plan
.
Schletter Solar GmbH – Alustraße 1 – 83527 Kirchdorf