IR Sensor:
1) The main box of the machine has the IR Sensor installed and partly
pre-wired.
Main Shaft Bearings:
1) Press the main shaft bearings into place in the holes provided in the
box side walls. They are pressed from the outside of the box.
2) Put a piece of tape over each bearing on the outside of the box. The
bearings are a very light press fit. They will be held securely in place
when the main shaft and cover are installed later.
Main Circuit Board Wiring
As shown in fig 15, align the winder cover to the right
and the winder box to the left.
1) Solder the black wire from the motor to pad 1
2) Solder the white wire from the motor to pad 2
3) Solder the red wire from the pot to pad 3
4) Solder the green wire from the pot to pad 4
5) Solder the white wire from the power jack to pad 5
6) Solder the black wire from the power jack to pad 6
7) Solder the white wire from the IR sensor to pad 9
8) Solder the red wire from the IR sensor to pad 8
9) Solder the bare wire from the IR sensor to pad 7
Installing The Main Shaft
Note: The main shaft has a flat surface on one ‘side’.
When securing collars, IR reflector, and
pulley, make sure that all of the allen
screws are tightened down onto this flat
surface.
1) Install a wire clip on the inside of the
main box as shown in the photo. Make
sure that it is placed so that it will not
interfere with the IR reflector.
2) Slide the red and green wires from the
control pot into the wire clip.
3) Install one collar at one end of the end
of the main shaft. Line up the allen with
the flat of the shaft and tighten the collar.
4) Remove the tape holding the bearings
in place. Insert the main shaft through the
bearing on the IR wall side of the box.
5) Slide the IR reflector onto the main shaft
with the collar part away from the IR
sensor as shown.
6) Holding the IR reflector so that it doesn’t jam against the control pot, slide the main shaft through the bearing on the
opposite wall of the box.
Fig 14
Fig 15
Fig 16