background image

Installation, Mounting and Maintenance DISA-360

Z11/35 - 5

Construction subject to change.

No return possible!

20.10.2015

Version:

Installation and commissioning

Operating conditions

Prior to installation or commissioning of the device, the follow-

ing operating conditions must be observed:

Material reception 

Upon reception of the materials, the components must be care-

fully checked, in order to guarantee that no transport damage

has taken place. Moreover, the dimensions, composition and

number of the identification sticker must be checked as to

whether they are as ordered.

Identification sticker:

To prevent possible damage during transport, the devices will

be delivered ex works on pallets (that correspond to the partic-

ular weight and dimensions) wrapped with tapes and transpar-

ent plastic film. It is recommended leaving this protection in

place until the device is commissioned. The openings of the

pipes should be closed with dust caps to avoid dust and entry of

dirt.

 

Transport, lifting and handling

Transport and handling of the unit

shall take place in the position in

which the unit is to be built in later on,

unless expressly stated otherwise on

the unit.

Transport, unloading and lifting of

the unit shall take place with the nec-

essary care and using tools that are

appropriate for the weight and dimensions.

(1) 

Standard unit: h slot + grille and heat exchanger (empty)

Storage

If the device is not installed immediately after its reception, it

must be stored according to the following instructions:

- Coolant or heating fluid: water or glycols (ethylene

 or propylene) at a concentration below 60%.

- Water inlet temperature: above the dew point up to 80°C

(Please note that some connectors do not work at water

temperatures above 65°C)

- Air inlet temperature: from 2 to 45°C
- Max. operating pressure: 8 bar / 125°C.

-

H: 

2-pipe system

-

OL: 

without air deflection blades

-

SR: 

Foldable perforated sheet, perforation Ø 6 mm

-

B: 

Nozzle configuration -B-

-

592: 

total width -592 mm-

-

592: 

total length -592 mm-

-

WS1:

 Water connection -left-

-

H: 

Connection -horizontal-

-

AS1:

 Number of connecting pieces - -1 connection pipe arranged

-

123:

 Diameter of the connection pipes -123 mm -

To prevent deposits and corrosion, 

the quality of the water for filling the registers must

comply with regulations VDI 2035 and DIN 50930.

SCHAKO Iberia, S.L. - Pol. Ind. Río Gállego, C/B, nave 3 - E-50840 San Mateo de Gállego.

Model

 / Modelo / Modell

DISA-360-H-OL-SR-B-592-592-WS1-H-AS1-123

 Order 

nr.

 / Nº Pedido /  Auftragsnr: 

2198/09

 Date 

/ Fecha /Datum: 

22/10/2013

 Reference

 / Referencia / Referenz: 

Sala 1 Hospital Clínico

 Comments 

/ Observaciones / Bemerkungen:

Read manual of instructions

 / Lea el manual de instrucciones / Betriebs- und 

Wartungsvorschriften beachten.

Do not drill the machine

 / Maschine nicht durchbohren / No taladrar la máquina

Special attention in the connection nuts-coil

 / Besondere Vorsicht an der 

Registerverschraubung/ Especial cuidado en la conexión tuercas-batería .

Recycle or arrange the residues according to the current rules

 / Recicle o gestione 

los residuos según la normativa vigente. Bitte, entsprechend der gültigen 
Gezetzgebung recyclen.

NL

600

1200

Weights

 (1) 

(kg) 14,5

28

- The device must be stored at a dry, clean, safe location

where no damage to the device can occur, i.e., outside

corrosive atmospheric influences.

- Leave the protections attached ex works (film, tapes, pal-

lets, etc.) on the device, unless they have already been re-

moved beforehand.

- Cover the device with tarpaulins, in order to protect it from

dust, moisture and extreme temperatures.

- Entries, openings and pipes must be hermetically sealed

with dust caps.

Should manufacture-related damage be detected

on the device, please contact your local sales office

prior to installation.

The unit shall only be held in position or moved 

by holding on to the housing. The weight must not

rest on the water connections.

SCHAKO cannot be held liable for damage to the

unit caused by improper handling or handling not

mentioned here, loading or unloading.

Содержание DISA-360

Страница 1: ...Ferdinand Schad KG Steigstra e 25 27 D 78600 Kolbingen Telephone 49 0 74 63 980 0 Fax 49 0 74 63 980 200 info schako de www schako de Installation Mounting and Maintenance DISA 360...

Страница 2: ...ered model 4 Function 4 Installation and commissioning 5 Operating conditions 5 Material reception 5 Transport lifting and handling 5 Storage 5 Installation 6 Mounting 6 Hydraulic connections 6 Connec...

Страница 3: ...lacement of defec tive materials Recycling The inspection installation hydraulic connection and com missioning of the device must be carried out by qualified skilled personnel only in compliance with...

Страница 4: ...ing or optionally 4 pipe system cooling and heating The registers consist of cop per pipes 12 mm in thickness aluminium ribs and a steel frame Grille 3 Possible designs perforated sheet grille made of...

Страница 5: ...Foldable perforated sheet perforation 6 mm B Nozzle configuration B 592 total width 592 mm 592 total length 592 mm WS1 Water connection left H Connection horizontal AS1 Number of connecting pieces 1 c...

Страница 6: ...void excessive tighten ing or twisting of the register connections Make sure that places that are intended as openings for air admission and air discharge are free of pipes electric ca bles crossbeams...

Страница 7: ...ends on the select ed model Please follow the instructions enclosed with each model Adjustment of the air deflection blades To regulate the air flow ro tate the air deflection blades manually With blo...

Страница 8: ...by spraying it with a non aggressive cleaner Hydraulic connections were tightened properly and exhib it no leaks Connecting and fastening elements have been sufficiently tightened Adequate access for...

Страница 9: ...lean it by spraying it with water or compressed air or by evacua tion Please do not use any scouring agents for cleaning since these materials may impair or damage the DISA 360 gal vanised steel alumi...

Страница 10: ...e nozzles at the primary air plenum box see drawing and the other end is con nected to the hose connection of a Pa meter The values read on the meter and the following formula can be used to to determ...

Страница 11: ...or Install thermostat in a different place Clogging of the cooling heating register Clean the register in accordance with the maintenance instructions The unit is losing water Condensate in the regist...

Отзывы: