19:03-15
ã
Scania CV AB 2002, Sweden
9
Note:
Make sure no metal shavings are left on
the roof as they will corrode and fasten.
2
Apply a little anti-corrosive agent to the
edge of the hole. Allow the agent to dry.
Note:
Make sure the aerial nut underneath the
roof is in good contact with the metal. This will
ensure a good earth.
3
Pull through the cables and screw the aerial
into the hole.
Routing the aerial wiring
1
Attach the GPS and GSM cables to the
aerial cables.
2
The extra cable for the FM band can be used
for the radio. If this cable is not being used,
insulate it with tape and fasten it underneath
the roof.
3
Run the cables via the headlining panels
towards the windscreen and down behind
the right-hand roof shelf lid. Then pull out
the cables through the hole in the headlining
to where the GPS/GSM module is being
fitted.
12
55
10
125511
Installation