12
ã
Scania CV AB 2002, Sweden
19:03-15
10
Vehicles with VPS:
Connect C267 to the VPS system connector.
The alarm from the GPS/GSM module goes
to the Scania Fleet Management Portal
(FMP) and indicates the activated alarm,
time and vehicle position.
11
Vehicles without VPS:
Insulate the connector with tape and fasten
the cable in a suitable position. If the cable
has been run via the GPS/GSM module in
connection with commissioning.
12
Refit detached panels.
13
Refit the outlet air control 2.
14
Fasten the FMS control unit to the central
electric unit. Use a cable tie or the bracket
intended for the purpose.
15
Continue to run the FAS wiring from the
central electric unit to the GPS/GSM
module on the roof shelf via the right-hand
A pillar. To make it easier to run the wiring
via the A-pillar, it can be taped on.
1260
43
Installation