Installation and servicing instructions strictly reserved for qualifi
ed gas installers
17
5.1.3 Water treatment
In the case of an existing installation, it is Essential that prior to installing the new boiler
the system is thoroughly fl ushed. For optimum performance after
installation of a new system, the boiler and its associated central heating system
should also be fl ushed.
Flushing should be carried out in accordance with BS7593: 1992 using a
cleanser such as Sentinel X300 or X400, Fernox Superfl oc or Salamander corrosion
guard cleaner.
For long-term corrosion protection, after fl ushing, an inhibitor suitable for stainless
steel heat exchangers should be used, refer to the current issue of BS 5449 and BS 7593
on the use of inhibitors in central heating systems. Examples are Sentinel X100 Fernox or
Salamander corrosion guard inhibitor.
5.2 Dimensions
CONNECTIONS FOR FLUE
R M
SC
T L
F
C
G
52 52
88
39
400
347
750
735
116
223
284
40 30 46 53
13
941_2
R Heating
return
(green)
M Heating
fl
ow
(green)
SC Condense outlet
(orange) (fl exible pipe)
C
Hot water outlet (black)
F
Cold water inlet (white)
T Room
thermostat
L
Electrical power supply
G Gas
(white)
1
Flue products outlet
2
Air inlet for concentric system
116
223
1
2
942_1
Содержание Semia Condens F24 E
Страница 2: ......
Страница 23: ...Installation and servicing instructions strictly reserved for quali ed gas installers 21 1041_R00...
Страница 48: ......
Страница 49: ......
Страница 50: ...982790002 000...
Страница 51: ......