16
SAS 1SF - Twin Screw Feeder Assy & Control - APRIL 2020
CLEANING PROCEDURE
•
The ON/OFF switches on the power supply and to the equipment must be OFF
position before starting cleaning operation.
•
Wait for 10 seconds before entering the spray area.
•
Wash thoroughly and dry completely with low pressure compressed air at 2 bar
(29psi)
•
Wipe dry the equipment, plus all hoses and cables carefully and thoroughly,
before commencing production.
THIS IS VERY IMPORTANT.
IF NOT DRY IT CAN LEAD TO MATERIAL BUILD UP ON THE EQUIPMENT.
Before switching the electrostatic back ON, please check:
1.
Check that the equipment plus all hoses and cables are completely dry.
2.
Check that all equipment within the application area is correctly installed and
positioned.