Page 8
Multilift Installation Guide
Part No. 000643, 26-m02-2013
Step 5
Power up lift for installation
Connect the power cord (or battery) and then start up the
lift.
Procedure
For 110 VAC units
1
Remove the top cap (two screws).
Figure 3
Remove top cap
2
Remove the front panel (three screws).
Figure 4
Remove front panel
3
The lift power cord exists the base of the tower on the
left-hand side. Connect the power cord to a 110 VAC,
single-phase, 60 Hz, 15-Amp dedicated circuit.
Figure 5
Power cord exiting tower
4
The lift should be ready to run.
5
If the lift does not run, remove the panel in front of the
controller and diagnose the problem electrically,
referring to the wiring diagrams shipped with the lift.
For 12 VDC units
1
The lift is shipped with the battery cables exiting
through a hole in the bottom left-hand side of the
tower. You can temporarily connect the battery outside
the tower for installation and testing.
Figure 6
Battery cables exiting tower
2
Connect the battery cables to a Group 22F battery (refer
to the specifications below).
3
The lift should be ready to run.
4
If the lift does not run, remove the panel in front of the
controller and diagnose the problem electrically,
referring to the wiring diagrams shipped with the lift.
Battery specifications (Group 22F)
For 24 VDC units
1
The lift is shipped with the battery cables exiting
through a hole in the bottom left-hand side of the
tower. You can temporarily connect the batteries
outside the tower for installation and testing.
2
Connect the battery cables in series to the two 12V
batteries (P/N 105921). The batteries are Universal
UB12180 12V, 18AH.
3
The lift should be ready to run.
4
If the lift does not run, remove the panel in front of the
controller and diagnose the problem electrically,
referring to the wiring diagrams shipped with the lift.
Figure 7
Connecting two batteries
9
9
:LUH
9
:LUH
9
9
9
NOTE:
Refer to STEP13 later in this manual to permanently
install the batteries inside the tower and connect the cables.
Item
Specification
Type
Lead acid, deep cycle
Voltage
12 VDC
Capacity
Minimum 65 Amp Hour (AH)
Maximum dimension
to fit in tower
Height: 8-5/16”
Width: 6-7/8”
Length: 9-1/2”
Models recommended
U.S. Battery
East: 1-800-522-0945
West: 1-800-695-0945
22F-HC
Interstate Batteries
1-800-CRANK IT
USRM-22FS
Содержание Multilift
Страница 1: ...INSTALLATION GUIDE Part No 000643 26 m02 2013 Multilift VERTICAL PLATFORM LIFT...
Страница 7: ...Page 7 Part No 000643 26 m02 2013 Multilift Installation Guide Figure 2 Sample plan drawing...
Страница 26: ...Page 26 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call flush remote...
Страница 27: ...Page 27 Part No 000643 26 m02 2013 Multilift Installation Guide Hall call surface remote...
Страница 28: ...Page 28 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call in frame...
Страница 29: ...Page 29 Part No 000643 26 m02 2013 Multilift Installation Guide Landing gate harness...
Страница 30: ...Page 30 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call only gate harness...
Страница 41: ......