Page 4
Multilift Installation Guide
Part No. 000643, 26-m02-2013
Installation flow chart
BEGIN
END
Double-check
site specifics
Verify operation
Unpack and
verify shipment
Verify cab type
(handing)
Wind gate
spring hinges
Permanently install
battery (batteries)
Disassemble/
reassemble
acme screw
(if required)
Before leaving
job site
Anchor lift to
pad/floor
Position lift
Power up lift
for installation
Anchor lift to
pad/floor
Adjust
limit switches
(as required)
Install hall calls
(as required)
Reverse automatic
access ramp
(if required)
Install landing
gate or door
Install locks
and operators
(as required)
Adjust gate
closer (as required)
Reverse power cord
(if required)
Содержание Multilift
Страница 1: ...INSTALLATION GUIDE Part No 000643 26 m02 2013 Multilift VERTICAL PLATFORM LIFT...
Страница 7: ...Page 7 Part No 000643 26 m02 2013 Multilift Installation Guide Figure 2 Sample plan drawing...
Страница 26: ...Page 26 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call flush remote...
Страница 27: ...Page 27 Part No 000643 26 m02 2013 Multilift Installation Guide Hall call surface remote...
Страница 28: ...Page 28 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call in frame...
Страница 29: ...Page 29 Part No 000643 26 m02 2013 Multilift Installation Guide Landing gate harness...
Страница 30: ...Page 30 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call only gate harness...
Страница 41: ......