Page 23
Part No. 000643, 26-m02-2013
Multilift Installation Guide
Before leaving job site
Before leaving the job site, make sure the work area is
clean and the lift is safe and operational.
Procedure
1
Clean up the work area.
2
Make sure all hardware has been tightened.
3
Explain the operation of the elevator to the customer.
4
Assist the customer on an orientation ride.
5
Provide a copy of the Owner’s Manual and Warranty to
the customer. Be sure to record all required details per
the Owner’s Manual.
Содержание Multilift
Страница 1: ...INSTALLATION GUIDE Part No 000643 26 m02 2013 Multilift VERTICAL PLATFORM LIFT...
Страница 7: ...Page 7 Part No 000643 26 m02 2013 Multilift Installation Guide Figure 2 Sample plan drawing...
Страница 26: ...Page 26 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call flush remote...
Страница 27: ...Page 27 Part No 000643 26 m02 2013 Multilift Installation Guide Hall call surface remote...
Страница 28: ...Page 28 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call in frame...
Страница 29: ...Page 29 Part No 000643 26 m02 2013 Multilift Installation Guide Landing gate harness...
Страница 30: ...Page 30 Multilift Installation Guide Part No 000643 26 m02 2013 Hall call only gate harness...
Страница 41: ......