![Sartorius MA35 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/sartorius/ma35/ma35_operating-instructions-manual_1199626012.webp)
12
Warmup Time
To deliver exact results, the moisture analyzer must
warm up for at least 30 minutes every time you
connect it to AC power or after a relatively long
power outage .
Only after this time will the analyzer has reached
the required operating temperature .
Leveling the Moisture Analyzer
Purpose:
–
To compensate for unevenness at the place
of installation
–
This is particularly important for testing liquid
samples, which must be at a uniform level in the
sample pan
Always level the moisture analyzer again any time
after it has been moved to a different location .
§
Extend or retract the front and/or rear leveling feet
as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional;
Part No. YDS05MA)
!
To prevent burns, allow the glass panels to cool
sufficiently before removing them
!
Do not handle the aluminum panels with oily or
greasy fingers
!
Do not scratch the aluminum panels; do not use
abrasive or corrosive substances to clean the
aluminum panels
§
Remove the 2 rubber caps and the 2 screws
beneath them, and then remove the panel retainer
§
Remove the glass panels
§
Position the aluminum panels in the retainer
§
Fasten the aluminum panels with the retainer and
screws; replace the 2 rubber caps
Содержание MA35
Страница 2: ......
Страница 41: ...41 EU Declaration of Conformity ...