System Design
3. Refrigerant piping design
D-15
(8) Future system expansion
(1) Conditions for adding indoor units
1) Up to 24 indoor units can be connected to an outdoor unit. (Up to two W-Multi outdoor units can be installed
for up to 48 indoor units.)
2) Usable indoor unit capacity ranges are:
Minimum: 50% of the minimum capacity of the outdoor units
Maximum: 130% of the total capacity of the outdoor units
(2) Outdoor unit connection conditions (during initial installation, be sure to select piping sizes that will support the
total horsepower after expansion).
The following table shows the possible combination for future expansion based on the pipe (main pipe) size.
Outdoor unit planned for current installation
13 HP
16 HP
20 HP
25 HP
13 HP
-
16 HP
-
-
20 HP
-
-
-
Outdoor unit considered for expansion
(up to two units, or 50 HP)
25 HP
-
-
-
-
1) Outdoor units other than those indicated above cannot be used for expansion.
(Doing so may result in a
failure.)
2) During initial system installation, be sure to consider the requirements for indoor unit piping after expansion.
(3) Select piping sizes according to requirements after expansion. [Refer to section 2, “System Piping.”]
(4) If future system expansion is anticipated, install ball valves (sold separately) at the outdoor and indoor unit
sides of the branch pipe. (Figure 1)
1) To prevent oil from being drawn inside, slope piping opposite to flow direction.
2) Locate ball valves as close as possible to the main piping (within 40 cm).
3) If the diameter of the ball valve is smaller than the main piping, install a reducer at the valve.
4) Locate the equipment where it will be easy to operate and inspect in the future.
5) Ball valves for expansion should be installed with their service ports facing the future units they will serve.
Figure 1
Содержание ECO G SGP-EW120M2G2W
Страница 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Страница 12: ...Outdoor Unit 3 External Dimensions B 8 ...
Страница 13: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Страница 14: ...Outdoor Unit 5 Performance Characteristics B 10 Cooling Heating SGP EW120M2G2W ...
Страница 15: ...Outdoor Unit 5 Performance Characteristics B 11 Cooling Heating SGP EW150M2G2W ...
Страница 16: ...Outdoor Unit 5 Performance Characteristics B 12 Cooling Heating SGP EW190M2G2W ...
Страница 17: ...Outdoor Unit 5 Performance Characteristics B 13 Cooling Heating SGP EW240M2G2W ...
Страница 18: ...Outdoor Unit 6 Operating Sound Level Characteristics B 14 1 Standard Mode ...
Страница 19: ...Outdoor Unit 6 Operating Sound Level Characteristics B 15 ...
Страница 20: ...Outdoor Unit 6 Operating Sound Level Characteristics B 16 ...
Страница 21: ...Outdoor Unit 6 Operating Sound Level Characteristics B 17 ...
Страница 22: ...Outdoor Unit 6 Operating Sound Level Characteristics B 18 2 Quiet Mode ...
Страница 23: ...Outdoor Unit 6 Operating Sound Level Characteristics B 19 ...
Страница 24: ...Outdoor Unit 6 Operating Sound Level Characteristics B 20 ...
Страница 25: ...Outdoor Unit 6 Operating Sound Level Characteristics B 21 ...
Страница 28: ...Control Related 1 System Block Diagram C 2 ...
Страница 29: ...Control Related 2 Remote Control Warning List C 3 ...
Страница 30: ...Control Related 2 Remote Control Warning List C 4 ...
Страница 31: ...Control Related 2 Remote Control Warning List C 5 ...
Страница 38: ...System Design 3 Refrigerant piping design D 7 2 Selecting system header and branch piping sizes ...
Страница 75: ...Installation Work 1 Points regarding refrigerant pipe work E 2 1 Points regarding branch pipe work APR P160BG ...
Страница 76: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Страница 77: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Страница 78: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Страница 83: ...Installation Work 2 Points regarding electrical work outdoor unit E 10 1 Wiring thickness and device capacity ...
Страница 85: ...Installation Work 2 Points regarding electrical work outdoor unit E 12 3 Precautions regarding electrical work ...
Страница 86: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Страница 87: ...Installation Work 3 Outdoor unit installation work E 14 ...
Страница 88: ...Installation Work 3 Outdoor unit installation work E 15 ...
Страница 89: ...Installation Work 3 Outdoor unit installation work E 16 ...
Страница 90: ...Installation Work 3 Outdoor unit installation work E 17 ...
Страница 91: ...Installation Work 3 Outdoor unit installation work E 18 ...
Страница 92: ...Installation Work 3 Outdoor unit installation work E 19 ...
Страница 93: ...Installation Work 3 Outdoor unit installation work E 20 ...
Страница 94: ...Installation Work 3 Outdoor unit installation work E 21 ...
Страница 95: ...Installation Work 3 Outdoor unit installation work E 22 ...
Страница 96: ...Installation Work 3 Outdoor unit installation work E 23 ...
Страница 97: ...Installation Work 3 Outdoor unit installation work E 24 ...
Страница 98: ...Installation Work 3 Outdoor unit installation work E 25 ...
Страница 99: ...Installation Work 3 Outdoor unit installation work E 26 ...
Страница 100: ...Installation Work 3 Outdoor unit installation work E 27 ...
Страница 101: ...Installation Work 3 Outdoor unit installation work E 28 ...
Страница 102: ...Installation Work 3 Outdoor unit installation work E 29 ...
Страница 103: ...Installation Work 3 Outdoor unit installation work E 30 ...
Страница 104: ...Installation Work 3 Outdoor unit installation work E 31 ...
Страница 105: ...Installation Work 3 Outdoor unit installation work E 32 ...
Страница 106: ...Installation Work 3 Outdoor unit installation work E 33 ...
Страница 107: ...F 1 Separately Sold Parts Contents 1 Outdoor unit related parts 1 Exhaust extension kit SGP PEX560K F 2 ...