Periodic Inspection
1. Periodic inspection items and intervals
G-3
(3) Periodic inspection items outside the warranty period
The number of periodic inspections per year varies depending upon the number of hours of operating the
heating and cooling system.
The table below shows the case for 2,000 hours of heating/cooling operation in one year. If a periodic
inspection contract is concluded, then a GHP specialist service person will visit to carry out the indicated
inspections, replace parts, and make adjustments.
(The time to visit will be determined by the service person.)
Periodic
inspection
items
Inspection
period
To be determined by the specialist GHP service person.
Inspection
items
•
Coolant level inspection and filling: 10,000 hours or 5 years
•
Drain filter filler inspection: 10,000 hours or 5 years
•
Inspection and adjustment of each part: In accordance with the company’s periodic
inspection content
Inspection of engine system
Inspection of safety protection devices
Inspection and filling of engine oil
Acquisition of operation data
Check for gas leaks
Cleaning the inverter box and air filter
Part name
Replacement
interval
Type190
10,000 hours or
5 years
•
Engine oil
•
Engine oil filter
•
Air cleaner element
•
Spark plugs
•
Compressor operation belt
•
Oil absorbent mat
•
Oil absorbent tube
Periodic
replacement
parts
Note: The engine and the sub-oil panel are subject to the engine oil change.
Periodic
adjustments
•
Adjustment of the engine valve clearances: 10,000 hours or 5 years
A charge is made for periodic inspection.
Note: The periodic replacement period is calculated on the basis of 2,000 operating hours per year, and 13
years of use.
If it becomes necessary to replace parts other than the periodic replacement parts above, there will
be a charge separate from the periodic inspection contract charge.
Note: Garbage and dust sticking to the heat exchanger fans of the indoor unit and outdoor unit may result
in reduced performance or a failure. Therefore, it is recommended that you consult with the dealer
where the system was purchased or with a specialist service company, and have garbage removed
from the heat exchangers, and the heat exchangers cleaned. (A charge will be made for this
service.)
Содержание ECO G SGP-EGW190M2G2W
Страница 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Страница 9: ...Outdoor Unit 3 External Dimensions B 5 ...
Страница 10: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Страница 13: ...Outdoor Unit 6 Operating Sound Level Characteristics B 9 1 Standard Mode ...
Страница 14: ...Outdoor Unit 6 Operating Sound Level Characteristics B 10 2 Quiet Mode ...
Страница 17: ...Control 1 System Block Diagram C 2C 2 ...
Страница 18: ...Control Related 2 Remote Control Warning List C 3 ...
Страница 19: ...Control Related 2 Remote Control Warning List C 4 ...
Страница 20: ...Control Related 2 Remote Control Warning List C 5 ...
Страница 23: ...System Design 1 Operating temperature ranges for heating and cooling D 3 temperature is below 10ºC ...
Страница 25: ...System Design 2 Refrigerant piping design D 4 2 Selecting system header and branch piping sizes ...
Страница 40: ...Installation Work 1 Points regarding refrigerant pipe work E 2 1 Points regarding branch pipe work APR P160BG ...
Страница 41: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Страница 42: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Страница 43: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Страница 48: ...Installation Work 2 Points regarding electrical work outdoor unit E 10 1 Wiring thickness and device capacity ...
Страница 50: ...Installation Work 2 Points regarding electrical work outdoor unit E 12 3 Precautions regarding electrical work ...
Страница 51: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Страница 52: ...Installation Work 3 Outdoor unit installation work E 14 ...
Страница 53: ...Installation Work 3 Outdoor unit installation work E 15 ...
Страница 54: ...Installation Work 3 Outdoor unit installation work E 16 ...
Страница 55: ...Installation Work 3 Outdoor unit installation work E 17 ...
Страница 56: ...Installation Work 3 Outdoor unit installation work E 18 ...
Страница 57: ...Installation Work 3 Outdoor unit installation work E 19 ...
Страница 58: ...Installation Work 3 Outdoor unit installation work E 20 ...
Страница 59: ...Installation Work 3 Outdoor unit installation work E 21 ...
Страница 60: ...Installation Work 3 Outdoor unit installation work E 22 ...
Страница 61: ...Installation Work 3 Outdoor unit installation work E 23 ...
Страница 62: ...Installation Work 3 Outdoor unit installation work E 24 ...
Страница 63: ...Installation Work 3 Outdoor unit installation work E 25 ...
Страница 64: ...Installation Work 3 Outdoor unit installation work E 26 ...
Страница 65: ...Installation Work 3 Outdoor unit installation work E 27 ...
Страница 66: ...Installation Work 3 Outdoor unit installation work E 28 ...
Страница 67: ...Installation Work 3 Outdoor unit installation work E 29 ...
Страница 68: ...Installation Work 3 Outdoor unit installation work E 30 ...
Страница 69: ...Installation Work 3 Outdoor unit installation work E 31 ...
Страница 70: ...Installation Work 3 Outdoor unit installation work E 32 ...
Страница 71: ...Installation Work 3 Outdoor unit installation work E 33 ...
Страница 72: ...F 1 Separately Sold Parts Contents 1 Outdoor unit related parts 1 Exhaust extension kit SGP PEX560K F 2 ...